I. Lopes, S. Lopes, R. Pereira, S. Teixeira, A. F. Vaz
{"title":"A scheduling application to a molding injection machine: a challenge addressed on the 109th European Study Group with Industry","authors":"I. Lopes, S. Lopes, R. Pereira, S. Teixeira, A. F. Vaz","doi":"10.1007/978-3-319-63082-3_83","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":408747,"journal":{"name":"European Consortium for Mathematics in Industry","volume":"358 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Consortium for Mathematics in Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-319-63082-3_83","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}