Prototipe Manajemen Beban Otomatis Pada Sistem Tenaga Listrik Tegangan Rendah 1 Phasa

Herry Setyawan
{"title":"Prototipe Manajemen Beban Otomatis Pada Sistem Tenaga Listrik Tegangan Rendah 1 Phasa","authors":"Herry Setyawan","doi":"10.32528/ELKOM.V1I1.2180","DOIUrl":null,"url":null,"abstract":"The use of electricity now has become a basic requirement for modern society, not only in industry and offices, but also in housing. The problem with the distribution of electricity is that the power consumed must not exceed the current limiting installed because the increase in load causes the current to rise. Problems will arise if the continuity of electricity supply from PLN goes out due to overload, which will result in the activity stalled. The outage of electricity supply from PLN due to overload (over load) causes the users of electrical equipment to lose time and costs. The effects of sudden outages caused by overloading can damage electronic equipment. The system is made using AT89S51 microcontroller. The test results show that testing at each point shows that there is a linear relationship between the current measured by the output at each point. If there is a load group that has been extinguished but the ampere meter display still shows 2.00, the other load groups will be extinguished in a 60 second delay, until the ampere meter display shows a number below 2.00.","PeriodicalId":288340,"journal":{"name":"Jurnal Teknik Elektro dan Komputasi (ELKOM)","volume":"225 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Elektro dan Komputasi (ELKOM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32528/ELKOM.V1I1.2180","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The use of electricity now has become a basic requirement for modern society, not only in industry and offices, but also in housing. The problem with the distribution of electricity is that the power consumed must not exceed the current limiting installed because the increase in load causes the current to rise. Problems will arise if the continuity of electricity supply from PLN goes out due to overload, which will result in the activity stalled. The outage of electricity supply from PLN due to overload (over load) causes the users of electrical equipment to lose time and costs. The effects of sudden outages caused by overloading can damage electronic equipment. The system is made using AT89S51 microcontroller. The test results show that testing at each point shows that there is a linear relationship between the current measured by the output at each point. If there is a load group that has been extinguished but the ampere meter display still shows 2.00, the other load groups will be extinguished in a 60 second delay, until the ampere meter display shows a number below 2.00.
1阶段低压电系统自动负载管理的原型
电的使用现在已经成为现代社会的一项基本要求,不仅在工业和办公室,而且在住宅中。电力分配的问题是,所消耗的功率不能超过所安装的电流限制,因为负载的增加会导致电流上升。如果PLN的电力供应因过载而中断,将会出现问题,导致活动停滞。由于过载(过负荷)导致PLN供电中断,导致电气设备用户损失时间和成本。过载引起的突然断电会损坏电子设备。该系统采用AT89S51单片机实现。测试结果表明,在每个点的测试表明,在每个点的输出测量电流之间存在线性关系。如果有一个负载组已经熄灭,但电流表显示仍为2.00,则其他负载组将在60秒延迟后熄灭,直到电流表显示的数字低于2.00。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信