Automated Meter Reading and Advanced Metering Infrastructure projects

Husam A. Foudeh, A. Mokhtar
{"title":"Automated Meter Reading and Advanced Metering Infrastructure projects","authors":"Husam A. Foudeh, A. Mokhtar","doi":"10.1109/JIEEEC.2015.7470753","DOIUrl":null,"url":null,"abstract":"Two communication media between meter and server are applicable in Electrical Distribution Company (EDCO) in Jordan, namely, the Power Line Carrier (PLC) and the General Packet Radio Service (GPRS). In this paper, we discuss the implementation of these two communication media in the Automated Meter Reading (AMR) and the Advanced Metering Infrastructure (AMI) project in Jordan; and also point-out the main advantages and dis-advantages of using such grid of AMR/AMI based on these communication media.","PeriodicalId":432900,"journal":{"name":"2015 9th Jordanian International Electrical and Electronics Engineering Conference (JIEEEC)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 9th Jordanian International Electrical and Electronics Engineering Conference (JIEEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JIEEEC.2015.7470753","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

Abstract

Two communication media between meter and server are applicable in Electrical Distribution Company (EDCO) in Jordan, namely, the Power Line Carrier (PLC) and the General Packet Radio Service (GPRS). In this paper, we discuss the implementation of these two communication media in the Automated Meter Reading (AMR) and the Advanced Metering Infrastructure (AMI) project in Jordan; and also point-out the main advantages and dis-advantages of using such grid of AMR/AMI based on these communication media.
自动抄表和高级计量基础设施项目
约旦的配电公司(EDCO)采用电力线载波(PLC)和通用分组无线业务(GPRS)两种通信介质作为电表与服务器之间的通信介质。在本文中,我们讨论了这两种通信媒体在约旦的自动抄表(AMR)和高级计量基础设施(AMI)项目中的实现;并指出了基于这些通信媒介使用AMR/AMI网格的主要优点和缺点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信