{"title":"A stochastic control formulation of the continuous-time power system operation problem","authors":"M. Perninge, R. Eriksson","doi":"10.1109/EEEIC.2016.7555617","DOIUrl":null,"url":null,"abstract":"In this paper we show how to build an economically optimal feedback control strategy for the re-dispatch of electricity generation. We assume that the operator steers production in a set of controllable power plants by altering the active power set-point of each generator, within a set of predefined set-points. The operators strategy will be based on balancing the operating cost against the expected cost from unserved demand. Important aspects are ramp-rates at which production can approach the set-point, and switching costs arising from increased fuel consumption during ramping and wear and tear on production facilities.","PeriodicalId":246856,"journal":{"name":"2016 IEEE 16th International Conference on Environment and Electrical Engineering (EEEIC)","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE 16th International Conference on Environment and Electrical Engineering (EEEIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEEIC.2016.7555617","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In this paper we show how to build an economically optimal feedback control strategy for the re-dispatch of electricity generation. We assume that the operator steers production in a set of controllable power plants by altering the active power set-point of each generator, within a set of predefined set-points. The operators strategy will be based on balancing the operating cost against the expected cost from unserved demand. Important aspects are ramp-rates at which production can approach the set-point, and switching costs arising from increased fuel consumption during ramping and wear and tear on production facilities.