Independent Test Verification: What Metrics Have a Word to Say

N. Silva, Rui Lopes
{"title":"Independent Test Verification: What Metrics Have a Word to Say","authors":"N. Silva, Rui Lopes","doi":"10.1109/WoSoCER.2011.10","DOIUrl":null,"url":null,"abstract":"Independent verification and validation (IVV) has been a key process for decades, and is highlighted in several international certification standards. Some require independent safety auditors, others require particular process objectives to be satisfied with independence, others force an independent testing team or quality assurance team, or even independent resources for several different SDP processes. In the area of IVV, recently ESA contracted the creation of an \"ESA ISVV Guide\" with the description of all the possible tasks that can be carried out with independence in order to guarantee maximum quality, but especially to gather all the good practices and define uniform guidelines on how to carry out IVV activities. One of those activities is independent tests verification (stated as Integration/Unit Test Procedures and Test Data Verification). This activity is commonly overlooked since customers do not really see the added value of checking thoroughly the validation team work. This article presents the results of a large set of independent tests verification, including the main difficulties, results obtained and advantages/disadvantages for the industry of these activities. This study will support customers in opting-in or opting-out for this task in future IVV contracts since we provide factual results from a few real case studies. Case studies details and companies involved are not disclosed for obvious reasons.","PeriodicalId":318139,"journal":{"name":"2011 First International Workshop on Software Certification","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 First International Workshop on Software Certification","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WoSoCER.2011.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Independent verification and validation (IVV) has been a key process for decades, and is highlighted in several international certification standards. Some require independent safety auditors, others require particular process objectives to be satisfied with independence, others force an independent testing team or quality assurance team, or even independent resources for several different SDP processes. In the area of IVV, recently ESA contracted the creation of an "ESA ISVV Guide" with the description of all the possible tasks that can be carried out with independence in order to guarantee maximum quality, but especially to gather all the good practices and define uniform guidelines on how to carry out IVV activities. One of those activities is independent tests verification (stated as Integration/Unit Test Procedures and Test Data Verification). This activity is commonly overlooked since customers do not really see the added value of checking thoroughly the validation team work. This article presents the results of a large set of independent tests verification, including the main difficulties, results obtained and advantages/disadvantages for the industry of these activities. This study will support customers in opting-in or opting-out for this task in future IVV contracts since we provide factual results from a few real case studies. Case studies details and companies involved are not disclosed for obvious reasons.
独立测试验证:参数有什么要说的
几十年来,独立验证和确认(IVV)一直是一个关键过程,并在几个国际认证标准中得到强调。一些要求独立的安全审核员,另一些要求特定的过程目标以满足独立性,另一些要求独立的测试团队或质量保证团队,甚至是几个不同的SDP过程的独立资源。在IVV领域,欧空局最近签订了创建“欧空局ISVV指南”的合同,其中描述了为了保证最高质量而可以独立执行的所有可能任务,特别是收集所有良好做法并定义关于如何开展IVV活动的统一准则。其中一个活动是独立测试验证(称为集成/单元测试过程和测试数据验证)。这个活动通常被忽略,因为客户并没有真正看到彻底检查验证团队工作的附加价值。本文介绍了大量独立测试验证的结果,包括这些活动的主要困难、获得的结果和对行业的利弊。这项研究将支持客户在未来的IVV合同中选择加入或退出这项任务,因为我们提供了一些真实案例研究的事实结果。由于显而易见的原因,案例研究细节和涉及的公司没有披露。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信