Learning from The Legacy of Post-Disaster Recovery in Indonesia for The Acceleration of Post-Disaster Recovery in Lombok

S. Hadi
{"title":"Learning from The Legacy of Post-Disaster Recovery in Indonesia for The Acceleration of Post-Disaster Recovery in Lombok","authors":"S. Hadi","doi":"10.36574/JPP.V3I1.56","DOIUrl":null,"url":null,"abstract":"As a country known for its very disaster-prone areas, Indonesia has experienced frequent disasters, either large, medium and small-scale ones, which even in the last six months have had at least a fairly large-scale natural disaster, one of which is an earthquake occurred in Lombok in late July to mid-August 2018. Learning from the experiences of post-disasters management that have occurred before, especially after the earthquake and tsunami disaster in Aceh and Nias in 2004, the earthquake in Yogyakarta in 2006, the earthquake in West Sumatra in 2009, and eruption of Mount Merapi in 2010, the post-disaster recovery process needs to be carried out in an integrated and comprehensive manner, by involving participation of stakeholders at the national and regional levels, not only the central government, local governments and other government partners. In relation to the post-earthquake recovery efforts in Lombok in 2018 which affected seven districts/cities in NTB Province which resulted in recovery needs of more than Rp. 11 trillion, despite the issuance of the Presidential Instruction policy framework Number 5 of 2018 on the Acceleration of Post-Disaster Rehabilitation and Reconstruction in NTB Province, which assigns relevant ministries/agencies and Governor and Regents and Mayors whose areas are affected in NTB Province, to be able to accelerate the process of recovering local conditions and disaster-affected communities in the affected NTB region, which for implementation still requires operational policies and strategies in the field. For this reason, some best-practices in managing the recovery process from previous disasters can be used as input in establishing appropriate and applicable policies and strategies in order to accelerate the rehabilitation and reconstruction of post-disaster areas in Lombok further, to realize a recovery to rebuild a better one, safer and more sustainable.","PeriodicalId":209567,"journal":{"name":"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36574/JPP.V3I1.56","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

As a country known for its very disaster-prone areas, Indonesia has experienced frequent disasters, either large, medium and small-scale ones, which even in the last six months have had at least a fairly large-scale natural disaster, one of which is an earthquake occurred in Lombok in late July to mid-August 2018. Learning from the experiences of post-disasters management that have occurred before, especially after the earthquake and tsunami disaster in Aceh and Nias in 2004, the earthquake in Yogyakarta in 2006, the earthquake in West Sumatra in 2009, and eruption of Mount Merapi in 2010, the post-disaster recovery process needs to be carried out in an integrated and comprehensive manner, by involving participation of stakeholders at the national and regional levels, not only the central government, local governments and other government partners. In relation to the post-earthquake recovery efforts in Lombok in 2018 which affected seven districts/cities in NTB Province which resulted in recovery needs of more than Rp. 11 trillion, despite the issuance of the Presidential Instruction policy framework Number 5 of 2018 on the Acceleration of Post-Disaster Rehabilitation and Reconstruction in NTB Province, which assigns relevant ministries/agencies and Governor and Regents and Mayors whose areas are affected in NTB Province, to be able to accelerate the process of recovering local conditions and disaster-affected communities in the affected NTB region, which for implementation still requires operational policies and strategies in the field. For this reason, some best-practices in managing the recovery process from previous disasters can be used as input in establishing appropriate and applicable policies and strategies in order to accelerate the rehabilitation and reconstruction of post-disaster areas in Lombok further, to realize a recovery to rebuild a better one, safer and more sustainable.
从印尼灾后恢复的经验中吸取教训加快龙目岛灾后恢复
印尼是一个灾害频发的国家,大、中、小规模灾害频发,过去半年至少发生过一次规模较大的自然灾害,2018年7月下旬至8月中旬发生在龙目岛的地震就是其中之一。借鉴以往的灾后管理经验,特别是在2004年亚齐和尼亚斯地震和海啸灾害、2006年日arta地震、2009年西苏门答腊地震和2010年默拉皮火山喷发之后,灾后恢复过程需要以综合和全面的方式进行,不仅需要中央政府,而且需要国家和地区各级利益攸关方的参与。地方政府和其他政府合作伙伴。关于2018年龙目岛地震后的恢复工作,影响了NTB省的七个地区/城市,导致恢复需求超过11万亿比索,尽管发布了关于加速NTB省灾后恢复和重建的2018年第5号总统指示政策框架,该框架分配了NTB省受灾地区的相关部委/机构以及州长、董事和市长,能够加快恢复受影响的北部结核地区的当地条件和受灾社区的进程,这一进程的实施仍然需要实地的业务政策和战略。因此,管理以往灾害恢复过程中的一些最佳做法可以作为制定适当和适用的政策和战略的投入,以进一步加快龙目岛灾后地区的恢复和重建,实现重建一个更好、更安全、更可持续的恢复。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信