Recurrent Expenditure Requirements of Capital Projects: Estimation for Budget Purposes

R. Hood, D. Husband, Fei Yu
{"title":"Recurrent Expenditure Requirements of Capital Projects: Estimation for Budget Purposes","authors":"R. Hood, D. Husband, Fei Yu","doi":"10.1596/1813-9450-2938","DOIUrl":null,"url":null,"abstract":"This paper examines the issue of estimating recurrent costs associated with capital projects in the investment budget. It is intended to help overcome budget planning problems which give rise to the chronic under-funding of maintenance and operating costs typical in some developing economies. The objective is to provide guidance in the preparation of budget submissions so that information on the future recurrent cost implications of today's capital spending is quantified in a way that supports the authorities in making project selection and budget decisions. The paper is in three parts. The first part outlines some concepts and definitions involved in measuring recurrent costs. The second part provides stylized examples of individual projects. And the third part presents some rough empirical guidance drawn from a sample of actual investment projects.","PeriodicalId":379098,"journal":{"name":"World Bank: Public Sector Management (Topic)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Bank: Public Sector Management (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1596/1813-9450-2938","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

Abstract

This paper examines the issue of estimating recurrent costs associated with capital projects in the investment budget. It is intended to help overcome budget planning problems which give rise to the chronic under-funding of maintenance and operating costs typical in some developing economies. The objective is to provide guidance in the preparation of budget submissions so that information on the future recurrent cost implications of today's capital spending is quantified in a way that supports the authorities in making project selection and budget decisions. The paper is in three parts. The first part outlines some concepts and definitions involved in measuring recurrent costs. The second part provides stylized examples of individual projects. And the third part presents some rough empirical guidance drawn from a sample of actual investment projects.
基本建设项目的经常开支需求:预算估计
本文探讨了投资预算中与资本项目相关的经常性成本估算问题。它的目的是帮助克服预算规划问题,这些问题造成一些发展中经济体典型的维修和业务费用长期资金不足。其目的是为编制预算提供指导,以便以一种支持当局选择项目和作出预算决定的方式,对有关当前资本支出未来所涉经常费用的资料进行量化。本文分为三个部分。第一部分概述了计量经常费用所涉及的一些概念和定义。第二部分提供了各个项目的程式化示例。第三部分以实际投资项目为样本,给出了一些粗略的经验指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书