Well Cementing with Elastic Properties Cement Stone and Liner Rotation is the Key to the Successful Development of Hard-to-Recover or Tight Oil Reserves from Bazhenov Formation

Ivan Susliakov, T. Shevchuk, A. Alekseev, Alexey Dryaba, Andrey Alyakin, Oleg Sekachev
{"title":"Well Cementing with Elastic Properties Cement Stone and Liner Rotation is the Key to the Successful Development of Hard-to-Recover or Tight Oil Reserves from Bazhenov Formation","authors":"Ivan Susliakov, T. Shevchuk, A. Alekseev, Alexey Dryaba, Andrey Alyakin, Oleg Sekachev","doi":"10.2118/198366-ms","DOIUrl":null,"url":null,"abstract":"\n Significant progress in technologies development of well completion and stimulation allowed to involve in the development of reserves which 10 years ago were considered unpromising due to the too low reservoir permeability. Particularly significant influence of modern achievements on shale beds, which were previously not seriously considered as possible objects for hydrocarbon production. The success of shale oil production in the United States inspires oil companies around the world to study the possibility for the development of such objects.\n On the territory of the Russian Federation is perhaps the largest area of shale formation of the world – Bazhenov formation. In 2016, PJSC Gazprom Neft for the first time for the Bazhenov formation implemented a full cycle of construction of a horizontal well with a Multi-Stage Fracturing, which on the level of the applied technological solutions is not inferior to the American analogues used in the United States for shale oil production. The length of the horizontal section of the well was more than 1000 m; the 114 mm liner OD was run in and cemented. The cementing operation was carried out with liner rotation, and the cement blend itself contained specially selected additives which were designed to ensure high resistance of the cement stone to the damaging effects from multi-stage fracturing.\n The experience in drilling and cementing, completion and production operation of the well turned out to be positive, and in 2018, a pilot project started drilling a whole series of horizontal wells with multi-stage fracturing at two well sites. During the implementation of the project was found a stable relationship between the well production and the efficiency of fracturing, which is significantly affected by the isolation the anulus.","PeriodicalId":406524,"journal":{"name":"Day 3 Fri, October 18, 2019","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Fri, October 18, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198366-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Significant progress in technologies development of well completion and stimulation allowed to involve in the development of reserves which 10 years ago were considered unpromising due to the too low reservoir permeability. Particularly significant influence of modern achievements on shale beds, which were previously not seriously considered as possible objects for hydrocarbon production. The success of shale oil production in the United States inspires oil companies around the world to study the possibility for the development of such objects. On the territory of the Russian Federation is perhaps the largest area of shale formation of the world – Bazhenov formation. In 2016, PJSC Gazprom Neft for the first time for the Bazhenov formation implemented a full cycle of construction of a horizontal well with a Multi-Stage Fracturing, which on the level of the applied technological solutions is not inferior to the American analogues used in the United States for shale oil production. The length of the horizontal section of the well was more than 1000 m; the 114 mm liner OD was run in and cemented. The cementing operation was carried out with liner rotation, and the cement blend itself contained specially selected additives which were designed to ensure high resistance of the cement stone to the damaging effects from multi-stage fracturing. The experience in drilling and cementing, completion and production operation of the well turned out to be positive, and in 2018, a pilot project started drilling a whole series of horizontal wells with multi-stage fracturing at two well sites. During the implementation of the project was found a stable relationship between the well production and the efficiency of fracturing, which is significantly affected by the isolation the anulus.
具有弹性特性的水泥石固井和尾管旋转固井是Bazhenov组难采或致密油成功开发的关键
由于完井和增产技术的重大进步,使得10年前由于储层渗透率太低而被认为毫无希望的储量得以开发。现代成果对页岩层的影响尤其显著,而页岩层以前并没有被认真考虑作为可能的油气生产对象。美国页岩油生产的成功激励了世界各地的石油公司研究开发此类产品的可能性。在俄罗斯联邦的领土上可能是世界上最大的页岩地层-巴切诺夫地层。2016年,PJSC Gazprom Neft首次在Bazhenov地层实施了多级压裂水平井的完整施工周期,其应用技术解决方案的水平不逊于美国用于页岩油生产的类似技术。井的水平段长度大于1000m;下入外径114mm尾管并固井。固井作业是在尾管旋转的情况下进行的,水泥混合物本身含有特殊选择的添加剂,旨在确保水泥石具有较高的抗多级压裂破坏作用的能力。该井在钻井、固井、完井和生产操作方面的经验是积极的,2018年,一个试点项目开始在两个井场钻一系列多级压裂水平井。在项目实施过程中,发现了油井产量与压裂效率之间的稳定关系,而压裂效率受环空隔离的影响较大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信