Determining maximum photovoltaic penetration in a distribution grid considering grid operation limits

R. A. Kordkheili, B. Bak‐Jensen, Jayakrishnan R-Pillai, P. Mahat
{"title":"Determining maximum photovoltaic penetration in a distribution grid considering grid operation limits","authors":"R. A. Kordkheili, B. Bak‐Jensen, Jayakrishnan R-Pillai, P. Mahat","doi":"10.1109/PESGM.2014.6939292","DOIUrl":null,"url":null,"abstract":"High penetration of photovoltaic panels in distribution grid can bring the grid to its operation limits. The main focus of the paper is to determine maximum photovoltaic penetration level in the grid. Three main criteria were investigated for determining maximum penetration level of PV panels; maximum voltage deviation of customers, cables current limits, and transformer nominal value. Voltage deviation of different buses was investigated for different penetration levels. The proposed model was simulated on a Danish distribution grid, considering grid parameters and operating condition in Denmark. Three different PV location scenarios were investigated for this grid: even distribution of PV panels, aggregation of panels at the beginning of each feeder, and aggregation of panels at the end of each feeder. Load modeling is done using Velander formula. Since PV generation is highest in the summer due to irradiation, a summer day was chosen to determine maximum PV penetration for the grid.","PeriodicalId":149134,"journal":{"name":"2014 IEEE PES General Meeting | Conference & Exposition","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"38","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE PES General Meeting | Conference & Exposition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM.2014.6939292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 38

Abstract

High penetration of photovoltaic panels in distribution grid can bring the grid to its operation limits. The main focus of the paper is to determine maximum photovoltaic penetration level in the grid. Three main criteria were investigated for determining maximum penetration level of PV panels; maximum voltage deviation of customers, cables current limits, and transformer nominal value. Voltage deviation of different buses was investigated for different penetration levels. The proposed model was simulated on a Danish distribution grid, considering grid parameters and operating condition in Denmark. Three different PV location scenarios were investigated for this grid: even distribution of PV panels, aggregation of panels at the beginning of each feeder, and aggregation of panels at the end of each feeder. Load modeling is done using Velander formula. Since PV generation is highest in the summer due to irradiation, a summer day was chosen to determine maximum PV penetration for the grid.
考虑电网运行限制,确定配电网中最大光伏渗透率
光伏板在配电网中的高渗透会使电网达到其运行极限。本文的主要重点是确定光伏在电网中的最大渗透水平。研究了确定光伏板最大穿透水平的三个主要标准;客户的最大电压偏差,电缆电流限值,变压器标称值。研究了不同渗透水平下不同母线的电压偏差。在考虑丹麦电网参数和运行条件的情况下,对该模型进行了仿真。针对该电网,研究了三种不同的光伏位置方案:光伏板均匀分布,每个馈线开始处的面板聚集,以及每个馈线结束处的面板聚集。载荷建模采用维兰德公式。由于受辐射影响,光伏发电在夏季最高,因此选择夏季来确定电网的最大光伏渗透率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信