A Review of Human Services Transportation Plans and Grant Programs

S. Carini, Lora Byala, Shana Johnson, E. Randall, Laura Riegel
{"title":"A Review of Human Services Transportation Plans and Grant Programs","authors":"S. Carini, Lora Byala, Shana Johnson, E. Randall, Laura Riegel","doi":"10.17226/14527","DOIUrl":null,"url":null,"abstract":"This digest presents the results of National Cooperative Highway Research Program (NCHRP) Project 20-65, Task 26, \"An Analysis and Evaluation of States' Implementation of the FTA 5310, 5316, and 5317 Programs.\" This project focused on two key related, but separate, objectives: (1) Determine the level of effort and costs associated with the development of coordinated public transit-human services transportation plans; and (2) Determine the perceived success of the Coordination Plans and the perceived success states and other grantees are having in awarding Federal Transit Administration (FTA) Section 5316 Job Access and Reverse Commute (JARC) and Section 5317 New Freedom (NF) funds and meeting the Coordination Plan objectives. This digest is organized in five chapters. Chapter 1 provides an introduction to the research effort. Chapter 2 reviews the approach and findings of the Internet survey of state departments of transportation. Chapter 3 summarizes the selection of states for further interview and the results of the telephone surveys. Chapter 4 highlights the JARC and NF appropriations and obligations by state and urbanized areas. Chapter 5 presents a comparison of the level of effort and success associated with the development of the Coordination Plans as well as opportunities for improving the success and effectiveness of the plans and grant programs.","PeriodicalId":320718,"journal":{"name":"NCHRP Research Results Digest","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NCHRP Research Results Digest","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17226/14527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This digest presents the results of National Cooperative Highway Research Program (NCHRP) Project 20-65, Task 26, "An Analysis and Evaluation of States' Implementation of the FTA 5310, 5316, and 5317 Programs." This project focused on two key related, but separate, objectives: (1) Determine the level of effort and costs associated with the development of coordinated public transit-human services transportation plans; and (2) Determine the perceived success of the Coordination Plans and the perceived success states and other grantees are having in awarding Federal Transit Administration (FTA) Section 5316 Job Access and Reverse Commute (JARC) and Section 5317 New Freedom (NF) funds and meeting the Coordination Plan objectives. This digest is organized in five chapters. Chapter 1 provides an introduction to the research effort. Chapter 2 reviews the approach and findings of the Internet survey of state departments of transportation. Chapter 3 summarizes the selection of states for further interview and the results of the telephone surveys. Chapter 4 highlights the JARC and NF appropriations and obligations by state and urbanized areas. Chapter 5 presents a comparison of the level of effort and success associated with the development of the Coordination Plans as well as opportunities for improving the success and effectiveness of the plans and grant programs.
对公共服务运输计划和拨款项目的回顾
本摘要介绍了国家合作公路研究计划(NCHRP)项目20-65的成果,任务26,“对各州实施自由贸易协定5310、5316和5317项目的分析和评估”。本项目侧重于两个相关但独立的关键目标:(1)确定与协调公共交通-人力服务运输计划的发展相关的努力水平和成本;以及(2)确定协调计划的感知成功情况,以及各州和其他受资助者在授予联邦运输管理局(FTA)第5316条工作机会和反向通勤(JARC)和第5317条新自由(NF)资金和实现协调计划目标方面的感知成功情况。本摘要分为五章。第一章介绍了本文的研究工作。第二章回顾了州交通部门网络调查的方法和结果。第三章总结了进一步访谈州的选择和电话调查的结果。第4章强调了各州和城市化地区对JARC和NF的拨款和义务。第5章比较了协调计划的发展过程中所付出的努力和取得的成功,以及提高计划和拨款项目的成功和有效性的机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信