Jung-Lo Park, Hyunsoo Jin, Kyung-Hwan Kim, Jae-Jun Kim
{"title":"A Study on Real-Time Progress Management System Modeling Using Goal and Scenario Based Requirements Engineering","authors":"Jung-Lo Park, Hyunsoo Jin, Kyung-Hwan Kim, Jae-Jun Kim","doi":"10.1109/ICCIT.2009.281","DOIUrl":null,"url":null,"abstract":"All sorts of technique for schedule progress management is being developed recently. In order to meet the demand, system development through various methodologies is proceeded in the whole areas of our society and this movement also can be found in the area of construction industry. In order to respond to such movement, in the area of construction industry we also intend to introduce development of various system. This study extracts users’ requirement and conducts system modelling through Goal & Scenario (G & Sc) based analysis method, and contents of such modeling are partially applied to real-time schedule progress management based on Robot based Construction Automation (RCA) project. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time. In addition, it attempts to present various system development in the area of construction industry not only in a specific area.","PeriodicalId":112416,"journal":{"name":"2009 Fourth International Conference on Computer Sciences and Convergence Information Technology","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Fourth International Conference on Computer Sciences and Convergence Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2009.281","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
All sorts of technique for schedule progress management is being developed recently. In order to meet the demand, system development through various methodologies is proceeded in the whole areas of our society and this movement also can be found in the area of construction industry. In order to respond to such movement, in the area of construction industry we also intend to introduce development of various system. This study extracts users’ requirement and conducts system modelling through Goal & Scenario (G & Sc) based analysis method, and contents of such modeling are partially applied to real-time schedule progress management based on Robot based Construction Automation (RCA) project. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time. In addition, it attempts to present various system development in the area of construction industry not only in a specific area.
各种进度管理技术是近年来发展起来的。为了满足需求,通过各种方法的系统开发在我们社会的整个领域进行,这种运动也可以在建筑行业领域找到。为了应对这种变化,在建筑行业领域,我们也打算引进各种制度的发展。本研究通过基于目标与场景(Goal & Scenario, G & Sc)的分析方法提取用户需求,进行系统建模,并将建模内容部分应用于基于机器人的施工自动化(Robot - based Construction Automation, RCA)项目的实时进度进度管理。通过本课题的研究,我们希望实现快速生成估计的进度信息,并实时模拟和分析实际的进度信息。此外,它试图呈现在建筑行业领域的各种制度的发展,而不仅仅是在一个特定的领域。