Supervision of an industrial plant subject to a maximal duration constraint

A. Atto, C. Martinez, S. Amari
{"title":"Supervision of an industrial plant subject to a maximal duration constraint","authors":"A. Atto, C. Martinez, S. Amari","doi":"10.1109/WODES.2008.4605954","DOIUrl":null,"url":null,"abstract":"This paper presents a method for the supervision of an industrial plant. This supervision is aimed at guaranteeing the respect of a maximal duration constraint for some specific processing, and is addressed by considering a discrete event system model for this industrial plant. In this associated model, the time constraint is reduced to elementary constraints whose contributions are taken into account in the state equation of the system, yielding a constrained state equation for the plant. Supervisors are then synthesized by looking for solutions of this constrained state equation.","PeriodicalId":105225,"journal":{"name":"2008 9th International Workshop on Discrete Event Systems","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 9th International Workshop on Discrete Event Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WODES.2008.4605954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

This paper presents a method for the supervision of an industrial plant. This supervision is aimed at guaranteeing the respect of a maximal duration constraint for some specific processing, and is addressed by considering a discrete event system model for this industrial plant. In this associated model, the time constraint is reduced to elementary constraints whose contributions are taken into account in the state equation of the system, yielding a constrained state equation for the plant. Supervisors are then synthesized by looking for solutions of this constrained state equation.
对受最长期限限制的工业厂房的监督
本文提出了一种工业厂房监控的方法。这种监督旨在保证对某些特定处理的最大持续时间约束的尊重,并通过考虑该工业工厂的离散事件系统模型来解决。在此关联模型中,时间约束被简化为基本约束,这些基本约束的贡献被考虑到系统的状态方程中,从而得到系统的约束状态方程。然后通过寻找约束状态方程的解来合成监督器。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信