{"title":"Statecharts model and heuristic scheduling of a production process","authors":"P. Kurdel, J. Sebestyénová","doi":"10.1109/INES.2011.5954764","DOIUrl":null,"url":null,"abstract":"Modern factories often employ elaborate manufacturing information systems involving a computer network and various databases. In practice, it often happens that soon after a plan or schedule has been generated, an unexpected event happens that forces the decision-maker to make changes. We present a Statecharts model of a small manufacturing plant. Based on analysis of manufacturing processes in a project partner firm, we model it as discrete event system. Further we propose a heuristic rescheduling algorithm for it.","PeriodicalId":414812,"journal":{"name":"2011 15th IEEE International Conference on Intelligent Engineering Systems","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 15th IEEE International Conference on Intelligent Engineering Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INES.2011.5954764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Modern factories often employ elaborate manufacturing information systems involving a computer network and various databases. In practice, it often happens that soon after a plan or schedule has been generated, an unexpected event happens that forces the decision-maker to make changes. We present a Statecharts model of a small manufacturing plant. Based on analysis of manufacturing processes in a project partner firm, we model it as discrete event system. Further we propose a heuristic rescheduling algorithm for it.