Test and evaluation for power IT apparatus

Seong-Jeong Rim, Yong-Jun Lee, Won-Tae Lee
{"title":"Test and evaluation for power IT apparatus","authors":"Seong-Jeong Rim, Yong-Jun Lee, Won-Tae Lee","doi":"10.1109/TD-ASIA.2009.5356846","DOIUrl":null,"url":null,"abstract":"This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356846","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.
电力IT设备的测试与评价
本文讨论了基于IEC 61850标准的电力IT设备的测试与评价方案。多家厂商生产的各种基于IEC 61850标准的电力IT设备将构成智能电网的实际测试场地。现场验收测试(SAT)是对设备在现场全部安装完成后进行的验收,在运行前向客户进行确认。为了达到有效的SAT,必须进行一致性测试。然而,设备通过了一致性测试,在集成、调试和运行过程中可能仍然存在问题。因此,为了减少集成、站点调试和操作过程中代价高昂的问题和问题的数量,需要互操作性测试以及一致性测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信