Influence of Building Information Modelling (BIM) on Engineering Contract Management in Nairobi, Kenya

Hellen Nyaboke Mosse, M. Njuguna, C. Kabubo
{"title":"Influence of Building Information Modelling (BIM) on Engineering Contract Management in Nairobi, Kenya","authors":"Hellen Nyaboke Mosse, M. Njuguna, C. Kabubo","doi":"10.4236/wjet.2020.83026","DOIUrl":null,"url":null,"abstract":"Building Information Modelling (BIM) is a technology and a process that has brought changes in the construction’s traditional procurement system. Kenya lacks contractual guidelines on implementation of BIM; this makes the adoption of BIM slow and difficult. Previous research has identified a gap in contractual relationships, roles and resulting risks. The objectives of this study were to investigate BIM adoption in Nairobi and to investigate the influence of BIM on Engineering Contract Management (ECM) in Nairobi Kenya. The survey research was a descriptive study with 175 responsive questionnaires. Respondents comprised of Civil Engineers, Construction Project Managers, Architects, Quantity Surveyors, Contractors and Facility Managers. Data was collected through self-administered questionnaire and in-depth interview. Descriptive analytics, correlation and Exploratory factor analysis methods were used to analyse quantitative data. Qualitative data was analysed thematically. It emerged that adoption level was at 56.6% and shallow understanding of BIM capabilities remains to be a barrier to its adoption and implementation. It also emerged that BIM improves ECM; when time, cost, quality, collaboration and return on investment improve, ECM becomes easier. Latent factors found in BIM and ECM relationship were Legal Implications, awareness and knowledge, efficiency, versatility, mandate and leadership, and competitiveness. Further, the study found out that BIM influence on ECM demands for establishment of standards, guidelines, policy, legal framework, and regulations, which can be achieved by amending the public procurement act which dictates the operation of all the other standard forms of contract. Further research should be conducted to measure whether the understanding of BIM had positively improved.","PeriodicalId":344331,"journal":{"name":"World Journal of Engineering and Technology","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/wjet.2020.83026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Building Information Modelling (BIM) is a technology and a process that has brought changes in the construction’s traditional procurement system. Kenya lacks contractual guidelines on implementation of BIM; this makes the adoption of BIM slow and difficult. Previous research has identified a gap in contractual relationships, roles and resulting risks. The objectives of this study were to investigate BIM adoption in Nairobi and to investigate the influence of BIM on Engineering Contract Management (ECM) in Nairobi Kenya. The survey research was a descriptive study with 175 responsive questionnaires. Respondents comprised of Civil Engineers, Construction Project Managers, Architects, Quantity Surveyors, Contractors and Facility Managers. Data was collected through self-administered questionnaire and in-depth interview. Descriptive analytics, correlation and Exploratory factor analysis methods were used to analyse quantitative data. Qualitative data was analysed thematically. It emerged that adoption level was at 56.6% and shallow understanding of BIM capabilities remains to be a barrier to its adoption and implementation. It also emerged that BIM improves ECM; when time, cost, quality, collaboration and return on investment improve, ECM becomes easier. Latent factors found in BIM and ECM relationship were Legal Implications, awareness and knowledge, efficiency, versatility, mandate and leadership, and competitiveness. Further, the study found out that BIM influence on ECM demands for establishment of standards, guidelines, policy, legal framework, and regulations, which can be achieved by amending the public procurement act which dictates the operation of all the other standard forms of contract. Further research should be conducted to measure whether the understanding of BIM had positively improved.
建筑信息模型(BIM)对肯尼亚内罗毕工程合同管理的影响
建筑信息模型(BIM)是一种技术和过程,它改变了传统的建筑采购系统。肯尼亚缺乏BIM实施的合同指导方针;这使得BIM的采用缓慢而困难。先前的研究已经确定了合同关系、角色和由此产生的风险方面的差距。本研究的目的是调查BIM在内罗毕的采用情况,并调查BIM对肯尼亚内罗毕工程合同管理(ECM)的影响。本研究采用描述性研究,共175份问卷。受访者包括土木工程师、建筑项目经理、建筑师、工料测量师、承包商和设施经理。数据收集采用自填问卷和深度访谈。定量资料采用描述性分析、相关分析和探索性因子分析方法。对定性数据进行专题分析。结果显示,采用率为56.6%,对BIM能力的肤浅理解仍然是其采用和实施的障碍。研究还发现,BIM改善了ECM;当时间、成本、质量、协作和投资回报得到改善时,ECM就会变得更容易。在BIM和ECM关系中发现的潜在因素是法律影响、意识和知识、效率、多功能性、授权和领导以及竞争力。此外,研究发现,BIM对ECM需求的影响包括建立标准、指导方针、政策、法律框架和法规,这可以通过修改公共采购法来实现,该法案规定了所有其他标准合同形式的运作。对于BIM的认识是否有了积极的提高,还需要进一步的研究来衡量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信