The Research on Decommissioning and Abandonment Engineering Practice of Onshore Oilfield: A Case Study of Block 1/2/4 in South Sudan

Qi Liu, Huifeng Liu, Xi Wang, Wanjun Li, Guobin Yang, Baletabieke Bahedaer, Long Yan, Jun Yan, Yifeng Yang, H. Tian, Peng Lu
{"title":"The Research on Decommissioning and Abandonment Engineering Practice of Onshore Oilfield: A Case Study of Block 1/2/4 in South Sudan","authors":"Qi Liu, Huifeng Liu, Xi Wang, Wanjun Li, Guobin Yang, Baletabieke Bahedaer, Long Yan, Jun Yan, Yifeng Yang, H. Tian, Peng Lu","doi":"10.2118/208494-ms","DOIUrl":null,"url":null,"abstract":"\n At the end of the lifespan of this onshore oilfield development, all wells and oil production system, transmission pipelines and all surface infrastructures shall be decommissioned in accordance with international guidelines for abandonment of oil and gas facilities.\n The development and production period relevant to Block 1/2/4 shall be ceased in 2033 as the PSC law approved by South Sudan Government. Considering that South Sudan is located along the Nile River in Africa, necessary measures shall be taken with respect to activities in the field to ensure effective protection for the environment. In addition, difficulties which have negative impact on decommission assessment shall be taken into account, such as inadequate wells data, the destruction of the facility by war, high security risks of Block 1/2/4, costly decommissioning and abandonment fees and so on.\n This paper combines the practice of Block 1/2/4 in South Sudan to introduce the decommissioning plan, abandonment working process, standard operation procedure for wells and surface facility disposal, and the calculation of the decommissioning fund. The decommissioning may include complete removal or abandonment in-situ which based on an evaluation of cost, safety and environmental impact. While a detailed decommissioning and abandonment proposal has been compiled and updated during the production phase of the project. When the final decommissioning and abandonment plans have been developed for upstream and midstream, the costs have been updated accordingly. These estimates had utilized by the operators to fund the decommissioning and abandonment obligations in accordance with the provisions of the oil company. The D&A task was successful and finally approved by the authority of government.\n Due to the successful completion of the decommissioning task of Block1/2/4, a completed decommissioning and abandonment management system has been established, including D&A cost calculation and standard operation procedure for wells and facility disposal, which can lower the environmental risk and reduce the capital expenditure at the end of the project. It can be regarded as a classic practice in petroleum industry and has a strong reference value.","PeriodicalId":335246,"journal":{"name":"Day 1 Tue, November 30, 2021","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 30, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208494-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

At the end of the lifespan of this onshore oilfield development, all wells and oil production system, transmission pipelines and all surface infrastructures shall be decommissioned in accordance with international guidelines for abandonment of oil and gas facilities. The development and production period relevant to Block 1/2/4 shall be ceased in 2033 as the PSC law approved by South Sudan Government. Considering that South Sudan is located along the Nile River in Africa, necessary measures shall be taken with respect to activities in the field to ensure effective protection for the environment. In addition, difficulties which have negative impact on decommission assessment shall be taken into account, such as inadequate wells data, the destruction of the facility by war, high security risks of Block 1/2/4, costly decommissioning and abandonment fees and so on. This paper combines the practice of Block 1/2/4 in South Sudan to introduce the decommissioning plan, abandonment working process, standard operation procedure for wells and surface facility disposal, and the calculation of the decommissioning fund. The decommissioning may include complete removal or abandonment in-situ which based on an evaluation of cost, safety and environmental impact. While a detailed decommissioning and abandonment proposal has been compiled and updated during the production phase of the project. When the final decommissioning and abandonment plans have been developed for upstream and midstream, the costs have been updated accordingly. These estimates had utilized by the operators to fund the decommissioning and abandonment obligations in accordance with the provisions of the oil company. The D&A task was successful and finally approved by the authority of government. Due to the successful completion of the decommissioning task of Block1/2/4, a completed decommissioning and abandonment management system has been established, including D&A cost calculation and standard operation procedure for wells and facility disposal, which can lower the environmental risk and reduce the capital expenditure at the end of the project. It can be regarded as a classic practice in petroleum industry and has a strong reference value.
陆上油田退役废弃工程实践研究——以南苏丹1/2/4区块为例
在该陆上油田开发的生命周期结束时,所有油井和石油生产系统、输送管道和所有地面基础设施应按照国际油气设施废弃准则退役。根据南苏丹政府批准的PSC法律,与1/2/4区块相关的开发和生产期将于2033年停止。考虑到南苏丹位于非洲尼罗河沿岸,应在实地活动中采取必要措施,确保对环境的有效保护。此外,还应考虑到对退役评估有负面影响的困难,如井资料不充分、设施被战争破坏、1/2/4区块安全风险高、退役和废弃费用昂贵等。本文结合南苏丹1/2/4区块的实践,介绍了该区块的退役方案、废弃作业流程、井及地面设施处置的标准作业流程以及退役资金的计算。根据成本、安全和环境影响的评估,退役可能包括完全拆除或就地废弃。在项目的生产阶段,已经编制和更新了详细的退役和废弃建议。当上游和中游的最终退役和废弃计划制定完成后,成本也会相应更新。根据石油公司的规定,作业者利用这些概算来支付退役和弃井的费用。D&A任务取得了成功,最终得到了政府部门的批准。由于1/2/4区块的退役任务圆满完成,建立了完整的退役废弃管理体系,包括D&A成本计算和井、设施处置的标准作业流程,降低了环境风险,减少了项目末期的资本支出。这是石油工业的经典实践,具有很强的参考价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信