Heuristic Method for Line Balancing and Simulation of Power Converter Assembly Line

M. H. Kharuddin, M. Ramli, M. Z. Zakaria
{"title":"Heuristic Method for Line Balancing and Simulation of Power Converter Assembly Line","authors":"M. H. Kharuddin, M. Ramli, M. Z. Zakaria","doi":"10.1109/ICSIMA.2018.8688764","DOIUrl":null,"url":null,"abstract":"The advantages of assembly line balancing provide in knowledge is well known and many researchers actively discussing and doing their research in this field. There are many ways to solve the assembly line balancing problem, one of the techniques that frequently used in assembly line balancing is a simulation approach. In this paper, the power converter assembly line which has 27 major tasks and 19 workstations is studied. The line balancing problem is solved by using two heuristics methods and then, by using simulation, the results from both methods are compared and the best method is chosen.","PeriodicalId":222751,"journal":{"name":"2018 IEEE 5th International Conference on Smart Instrumentation, Measurement and Application (ICSIMA)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 5th International Conference on Smart Instrumentation, Measurement and Application (ICSIMA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSIMA.2018.8688764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The advantages of assembly line balancing provide in knowledge is well known and many researchers actively discussing and doing their research in this field. There are many ways to solve the assembly line balancing problem, one of the techniques that frequently used in assembly line balancing is a simulation approach. In this paper, the power converter assembly line which has 27 major tasks and 19 workstations is studied. The line balancing problem is solved by using two heuristics methods and then, by using simulation, the results from both methods are compared and the best method is chosen.
电源变换器装配线平衡的启发式方法及仿真
装配线平衡所提供的优势在知识上是众所周知的,许多研究者都在积极地讨论和研究这一领域。解决装配线平衡问题的方法有很多,在装配线平衡中经常使用的技术之一就是仿真方法。本文以具有27个主要任务、19个工位的电源变换器装配线为研究对象。采用两种启发式方法求解线路平衡问题,并通过仿真对两种方法的求解结果进行比较,选择出最优的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书