{"title":"High Power, 140 GHz Gyrotron","authors":"K. Kreischer, R. Temkin, W. Mulligan, S. MacCabe","doi":"10.1109/ICSWA.1981.9335177","DOIUrl":null,"url":null,"abstract":"The design and construction of a pulsed 100 kW, 140 GHz gyrotron will be described. Initial gyrotron operation is expected in late 1981 or early 1982. Advances in gyrotron theory carried out in support of this experimental research will also be described.","PeriodicalId":254777,"journal":{"name":"1981 International Conference on Submillimeter Waves and Their Applications","volume":"228 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1981-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1981 International Conference on Submillimeter Waves and Their Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSWA.1981.9335177","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The design and construction of a pulsed 100 kW, 140 GHz gyrotron will be described. Initial gyrotron operation is expected in late 1981 or early 1982. Advances in gyrotron theory carried out in support of this experimental research will also be described.