{"title":"Electric diagram conception of a new substation BH Centro 2- Belo Horizonte - Minas Gerais - Brazil","authors":"A. M. Oliveira, P. C. C. D. Costa","doi":"10.1109/TDC-LA.2010.5762954","DOIUrl":null,"url":null,"abstract":"This paper presents the electric diagram conception of the new substation BH Centro 2, which will substitute the existent substation BH Centro 1, that currently supplies the central area of Belo Horizonte city. The BH Centro 1 substation is the biggest substation of Cemig Distribution Company, with regard to its transformation capacity (138-13.8 kV – 150 MVA). Operating since 1970, the substation has been showing maintenance problems associates to the difficulty of attainment of spare parts for some equipment and rise of the risk of failure due to its high period of operation. Thus, the construction of a new substation was defined. The conception of the BH Centro 2 substation faced some challenges, due limitations of space, special operational requirements because of medium voltage networks characteristics and short-circuits level limitation. Besides, we tried to avoid the utilization of special equipments, like high impedance transformers and high capacity reactors.","PeriodicalId":222318,"journal":{"name":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2010.5762954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper presents the electric diagram conception of the new substation BH Centro 2, which will substitute the existent substation BH Centro 1, that currently supplies the central area of Belo Horizonte city. The BH Centro 1 substation is the biggest substation of Cemig Distribution Company, with regard to its transformation capacity (138-13.8 kV – 150 MVA). Operating since 1970, the substation has been showing maintenance problems associates to the difficulty of attainment of spare parts for some equipment and rise of the risk of failure due to its high period of operation. Thus, the construction of a new substation was defined. The conception of the BH Centro 2 substation faced some challenges, due limitations of space, special operational requirements because of medium voltage networks characteristics and short-circuits level limitation. Besides, we tried to avoid the utilization of special equipments, like high impedance transformers and high capacity reactors.
本文介绍了新变电站BH Centro 2的电气示意图,该变电站将取代目前为贝洛奥里藏特市中心地区供电的现有变电站BH Centro 1。BH Centro 1变电站是Cemig配电公司最大的变电站,其变电能力(138-13.8 kV - 150 MVA)。该变电站自1970年开始运行以来,由于一些设备的备件难以获得,并且由于其高运行期而导致故障风险上升,因此一直存在维护问题。因此,一个新的变电站的建设是确定的。BH Centro 2变电站的设计面临着一些挑战,包括空间的限制、中压网络特性对运行的特殊要求以及短路水平的限制。此外,我们尽量避免使用特殊设备,如高阻抗变压器和大容量电抗器。