PERANCANGAN ULANG TURBIN KAPLAN POROS VERTIKAL DI PLTM PLUMBUNGAN

Bina Teknika Pub Date : 2018-12-17 DOI:10.54378/bt.v14i2.354
Rudi Saputra, Taff Liichan
{"title":"PERANCANGAN ULANG TURBIN KAPLAN POROS VERTIKAL DI PLTM PLUMBUNGAN","authors":"Rudi Saputra, Taff Liichan","doi":"10.54378/bt.v14i2.354","DOIUrl":null,"url":null,"abstract":"Hydroelectric Power Plants (PLTA) in Indonesia have been around since 1926, and are still operating today. The Indonesian government represented by PT. PLN (State Electricity Company) will continue to maintain, operate and maintain old hydropower plants. So far, the development and development of PLTMH in Indonesia still uses consultants / contractors and its manufacturing is from overseas, even components (spare parts) are also still dependent on the technology producers themselves, the majority of which are foreign countries. Imports cannot be avoided, this results in us being vulnerable to several things, fluctuations in foreign exchange rates, and dependence on foreign producers. But with the increasing understanding of national resilience, especially in terms of national industrial independence, several national companies began to carry out reconstruction and fabrication for hydroelectric power plants. This is encouraging the author to learn to know, understand, how to plan the main parts of the Kaplan Turbine which include: runner, shaft, spiral casing, stacker, draft tube. In this plan the author focuses on calculating the main dimensions of the Kaplan Turbine. From the results of the design and calculation, the appropriate type of turbine is Kaplan Turbine as an electric generator drive in Plumbungan PLTM with installed power of 1.2 MW, maximum head of 21.16 meters and water discharge requirement of 7.68 m3 / sec. Plumbungan PLTM installation consists of turbines, turbine supporting equipment, and turbine operation aids. The turbine installation component consists of: suction pipe (penstock), turbine house (spiral casing), runner, runner shaft, shaft support bearing and draft tube.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bina Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54378/bt.v14i2.354","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Hydroelectric Power Plants (PLTA) in Indonesia have been around since 1926, and are still operating today. The Indonesian government represented by PT. PLN (State Electricity Company) will continue to maintain, operate and maintain old hydropower plants. So far, the development and development of PLTMH in Indonesia still uses consultants / contractors and its manufacturing is from overseas, even components (spare parts) are also still dependent on the technology producers themselves, the majority of which are foreign countries. Imports cannot be avoided, this results in us being vulnerable to several things, fluctuations in foreign exchange rates, and dependence on foreign producers. But with the increasing understanding of national resilience, especially in terms of national industrial independence, several national companies began to carry out reconstruction and fabrication for hydroelectric power plants. This is encouraging the author to learn to know, understand, how to plan the main parts of the Kaplan Turbine which include: runner, shaft, spiral casing, stacker, draft tube. In this plan the author focuses on calculating the main dimensions of the Kaplan Turbine. From the results of the design and calculation, the appropriate type of turbine is Kaplan Turbine as an electric generator drive in Plumbungan PLTM with installed power of 1.2 MW, maximum head of 21.16 meters and water discharge requirement of 7.68 m3 / sec. Plumbungan PLTM installation consists of turbines, turbine supporting equipment, and turbine operation aids. The turbine installation component consists of: suction pipe (penstock), turbine house (spiral casing), runner, runner shaft, shaft support bearing and draft tube.
印度尼西亚的水力发电厂(PLTA)自1926年以来一直存在,至今仍在运行。以印尼国家电力公司(PT. PLN)为代表的印尼政府将继续维护、运营和维护旧水电站。到目前为止,PLTMH在印度尼西亚的开发和发展仍然使用顾问/承包商,其制造来自海外,甚至组件(备件)也仍然依赖于技术生产商自己,其中大部分是外国。进口无法避免,这导致我们容易受到几个方面的影响,汇率波动和对外国生产商的依赖。但随着人们对国家韧性的认识不断加深,特别是对国家工业独立的认识,一些国家公司开始进行水电站的改造和制造。这是鼓励作者学会认识和理解如何规划卡普兰水轮机的主要部件,包括:转轮、轴、螺旋机匣、堆料器、尾水管。在这个方案中,作者着重计算了卡普兰涡轮的主要尺寸。从设计计算结果来看,在Plumbungan PLTM中,合适的水轮机类型为Kaplan汽轮机作为发电机驱动,装机功率为1.2 MW,最大水头为21.16米,水量要求为7.68 m3 /秒。Plumbungan PLTM安装由水轮机、水轮机配套设备和水轮机操作辅助设备组成。水轮机安装部件由:吸入管(压力管)、轮机室(螺旋机匣)、转轮、转轮轴、轴支撑轴承和导水管组成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信