{"title":"Impacts of network expansion on generation capacity expansion","authors":"David Pozo, E. Sauma, J. Contreras","doi":"10.1109/PSCC.2014.7038320","DOIUrl":null,"url":null,"abstract":"A pessimistic three-level equilibrium model for a market-based expansion of both transmission and generation is proposed. The lower (third) level models the market outcome; the intermediate (second) level models the equilibrium in generation capacity expansion by taking into account the outcomes of the market equilibrium at the third level. The upper (first) level models the expansion of the transmission network. The second and third levels are modeled as an Equilibrium Problem with Equilibrium Constraints (EPEC) parameterized in terms of the optimal decisions of the transmission planner. This three-level hierarchy is motivated by the fact that transmission planners should consider expansions in generation that may take place, as well as the clearing of the market related to generation expansion, in order to make their decisions. At the first level, the transmission planner can take different positions with different impacts in the system because a manifold of equilibria is possible with different costs for the system. Unlike previously reported hierarchical approaches, which are implicitly formulated as optimistic, we solve the pessimistic solution of the problem (the transmission planner takes a pessimistic attitude towards the outcome of the generation expansion equilibrium). Results for a test power system are presented in order to show the efficiency and interpretations of the proposed model.","PeriodicalId":155801,"journal":{"name":"2014 Power Systems Computation Conference","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Power Systems Computation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSCC.2014.7038320","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

A pessimistic three-level equilibrium model for a market-based expansion of both transmission and generation is proposed. The lower (third) level models the market outcome; the intermediate (second) level models the equilibrium in generation capacity expansion by taking into account the outcomes of the market equilibrium at the third level. The upper (first) level models the expansion of the transmission network. The second and third levels are modeled as an Equilibrium Problem with Equilibrium Constraints (EPEC) parameterized in terms of the optimal decisions of the transmission planner. This three-level hierarchy is motivated by the fact that transmission planners should consider expansions in generation that may take place, as well as the clearing of the market related to generation expansion, in order to make their decisions. At the first level, the transmission planner can take different positions with different impacts in the system because a manifold of equilibria is possible with different costs for the system. Unlike previously reported hierarchical approaches, which are implicitly formulated as optimistic, we solve the pessimistic solution of the problem (the transmission planner takes a pessimistic attitude towards the outcome of the generation expansion equilibrium). Results for a test power system are presented in order to show the efficiency and interpretations of the proposed model.
网络扩容对发电容量扩容的影响
提出了一种基于市场的输电和发电并网扩张的悲观三级均衡模型。较低(第三)层次对市场结果进行建模;中间(第二层)层通过考虑第三层市场均衡的结果来建立发电能力扩张的均衡模型。上层(第一层)对传输网络的扩展进行建模。第二层和第三层被建模为一个均衡约束(EPEC)的均衡问题,该均衡约束是根据输电规划器的最优决策参数化的。这三个层次结构的动机是输电规划者应该考虑可能发生的发电扩张,以及与发电扩张相关的市场清算,以便做出决定。在第一级,输电计划者可以采取不同的位置,对系统产生不同的影响,因为系统可能存在多种平衡,而系统的成本不同。与先前报道的分层方法(隐式表述为乐观)不同,我们解决了问题的悲观解(传输规划器对发电扩展平衡的结果采取悲观态度)。最后给出了一个电力系统的测试结果,以证明该模型的有效性和解释性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信