Using a novel approach to cluster analysis to gain new valuable insights into software-project risk management

A. Alencar, Leucio T. Cruz, E. Schmitz, Armando Leite Ferreira
{"title":"Using a novel approach to cluster analysis to gain new valuable insights into software-project risk management","authors":"A. Alencar, Leucio T. Cruz, E. Schmitz, Armando Leite Ferreira","doi":"10.1109/BDIM.2008.4540074","DOIUrl":null,"url":null,"abstract":"This work presents a method that provides organizations and their project managers with a better understanding of the implications of the risks that software projects are subjected to. The method, which is based upon a novel approach to cluster analysis, generates a set of business rules indicating how risk factors may influence project performance. These rules are easy to read and understand, making it easier for managers to identify what needs to be done and when it needs to be done, before the worst happens.","PeriodicalId":426943,"journal":{"name":"2008 3rd IEEE/IFIP International Workshop on Business-driven IT Management","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 3rd IEEE/IFIP International Workshop on Business-driven IT Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/BDIM.2008.4540074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This work presents a method that provides organizations and their project managers with a better understanding of the implications of the risks that software projects are subjected to. The method, which is based upon a novel approach to cluster analysis, generates a set of business rules indicating how risk factors may influence project performance. These rules are easy to read and understand, making it easier for managers to identify what needs to be done and when it needs to be done, before the worst happens.
使用一种新颖的方法进行聚类分析,以获得对软件项目风险管理的新的有价值的见解
这项工作提出了一种方法,为组织和他们的项目经理更好地理解软件项目所遭受的风险的含义。该方法基于一种新颖的聚类分析方法,生成一组指示风险因素如何影响项目绩效的业务规则。这些规则易于阅读和理解,使管理者更容易在最坏的情况发生之前确定需要做什么以及何时需要做。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信