A Novel Forward-Backward Zero Bus Power Flow Method for the Placement of Renewable DGs in Distribution Network

Soumyabrata Barik, D. Das, R. Bansal, R. Naidoo, N. Das
{"title":"A Novel Forward-Backward Zero Bus Power Flow Method for the Placement of Renewable DGs in Distribution Network","authors":"Soumyabrata Barik, D. Das, R. Bansal, R. Naidoo, N. Das","doi":"10.1109/AUPEC52110.2021.9597713","DOIUrl":null,"url":null,"abstract":"The zero bus power flow (ZBPF) method is a recent development in the field of operation of active distribution network with renewable distributed generations (RNDGs), where a certain percentage of the total real and reactive power load demand is imported from the main grid, and the rest of the load demand is supplied by the DGs. DG connected to the zero bus ensures the pre-specified energy exchange with the upstream grid and the distribution network. However, to adopt the idea the standard load flow should be changed due to the absence of a slack bus. In literature, Newton-Raphson load flow (NRLF) is available; however, NRLF will not be converged for the distribution networks where the ratio of resistance to inductance $\\left(\\frac{R}{X}\\right)$ is very high. To sort out this issue, a modified forward-backward based load flow is developed in this paper to consider the effect of zero bus and pre-specified energy exchange with the upstream grid. To determine the location of zero bus, locations and the sizes of DGs, and shunt capacitor, a multi-objective optimization problem (MOOP) is proposed here. The fuzzy maxmin principle (FMMP) based mixed discrete particle swarm optimization (MDPSO) is applied for the optimal placement of the RNDGs, and shunt capacitor in 33 bus DN.","PeriodicalId":246799,"journal":{"name":"2021 31st Australasian Universities Power Engineering Conference (AUPEC)","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 31st Australasian Universities Power Engineering Conference (AUPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUPEC52110.2021.9597713","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The zero bus power flow (ZBPF) method is a recent development in the field of operation of active distribution network with renewable distributed generations (RNDGs), where a certain percentage of the total real and reactive power load demand is imported from the main grid, and the rest of the load demand is supplied by the DGs. DG connected to the zero bus ensures the pre-specified energy exchange with the upstream grid and the distribution network. However, to adopt the idea the standard load flow should be changed due to the absence of a slack bus. In literature, Newton-Raphson load flow (NRLF) is available; however, NRLF will not be converged for the distribution networks where the ratio of resistance to inductance $\left(\frac{R}{X}\right)$ is very high. To sort out this issue, a modified forward-backward based load flow is developed in this paper to consider the effect of zero bus and pre-specified energy exchange with the upstream grid. To determine the location of zero bus, locations and the sizes of DGs, and shunt capacitor, a multi-objective optimization problem (MOOP) is proposed here. The fuzzy maxmin principle (FMMP) based mixed discrete particle swarm optimization (MDPSO) is applied for the optimal placement of the RNDGs, and shunt capacitor in 33 bus DN.
配电网中可再生dg配置的一种新型正向向后零母线潮流方法
零母线潮流(ZBPF)方法是近年来在可再生分布式电源(rndg)有功配电网运行领域的一项新发展,该方法将一定比例的实际和无功负荷需求从主电网引入,其余负荷需求由可再生分布式电源提供。接入零母线的DG确保与上游电网和配电网进行预先规定的能量交换。然而,为了采用这个想法,标准负载流应该改变,因为没有空闲总线。在文献中,牛顿-拉夫森负荷流(NRLF)是可用的;然而,对于电阻电感比$\left(\frac{R}{X}\right)$很高的配电网,NRLF不会收敛。为了解决这一问题,本文提出了一种改进的基于前向后向的负荷流,考虑了零母线和与上游电网预先设定的能量交换的影响。为了确定零母线的位置、dg的位置和尺寸以及并联电容,本文提出了一个多目标优化问题。将模糊最大原理(FMMP)与混合离散粒子群算法(MDPSO)应用于33总线DN中rndg和并联电容的优化配置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书