{"title":"D3 - due dilligence documentation for electrical supervisors","authors":"M. Doherty, A. Kerr","doi":"10.1109/ESW.2011.6164720","DOIUrl":null,"url":null,"abstract":"This paper will discuss the due diligence and accountability requirements for electrical supervisors who must execute electrical tasks in a practical and effective manner. In the opinions of the authors these important concepts can be used for all stakeholder working groups including Transmission & Distribution, Power Generation, and Industrial, Commercial and Residential and everyone in between.","PeriodicalId":199039,"journal":{"name":"2011 IEEE IAS Electrical Safety Workshop","volume":"103 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE IAS Electrical Safety Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESW.2011.6164720","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper will discuss the due diligence and accountability requirements for electrical supervisors who must execute electrical tasks in a practical and effective manner. In the opinions of the authors these important concepts can be used for all stakeholder working groups including Transmission & Distribution, Power Generation, and Industrial, Commercial and Residential and everyone in between.