Spatial and temporal decomposition method in production management

M.C. Portamann, J.M. Proth
{"title":"Spatial and temporal decomposition method in production management","authors":"M.C. Portamann, J.M. Proth","doi":"10.1109/CIM.1988.5405","DOIUrl":null,"url":null,"abstract":"Some decomposition methods to split scheduling problems into smaller scheduling subproblems are discussed. Spatial decomposition methods consist of dividing the production system into subsystems that are as independent as possible. It is shown how to manage the remaining links between these subsystems. Temporal decomposition handles the problem with a decomposition along the time axes: part sets are scheduled successively, and these sets are built according to the release due dates of the parts. A spatial and temporal decomposition method is presented that first uses the spatial decomposition approach to obtain subproblems, and next computes the solution of the subproblems by the temporal decomposition approach. Numerical examples are given.<<ETX>>","PeriodicalId":334994,"journal":{"name":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIM.1988.5405","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Some decomposition methods to split scheduling problems into smaller scheduling subproblems are discussed. Spatial decomposition methods consist of dividing the production system into subsystems that are as independent as possible. It is shown how to manage the remaining links between these subsystems. Temporal decomposition handles the problem with a decomposition along the time axes: part sets are scheduled successively, and these sets are built according to the release due dates of the parts. A spatial and temporal decomposition method is presented that first uses the spatial decomposition approach to obtain subproblems, and next computes the solution of the subproblems by the temporal decomposition approach. Numerical examples are given.<>
生产管理中的时空分解方法
讨论了将调度问题分解为更小的调度子问题的方法。空间分解方法包括将生产系统划分为尽可能独立的子系统。它展示了如何管理这些子系统之间的剩余链接。时间分解通过沿着时间轴的分解来处理这个问题:零件集被先后安排,这些集根据零件的发布截止日期被构建。提出了一种时空分解方法,首先利用空间分解方法得到子问题,然后利用时间分解方法计算子问题的解。给出了数值算例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信