Determination of Critical Pattern of 60 Meter Ship Construction Project Using Precedence Diagram Method (PDM)

S. H. Sumantri, Suyono Thamrin, I. Apriyanto, E. Suhardono, Beny Rudiawan, Arica Dwi Susanto
{"title":"Determination of Critical Pattern of 60 Meter Ship Construction Project Using Precedence Diagram Method (PDM)","authors":"S. H. Sumantri, Suyono Thamrin, I. Apriyanto, E. Suhardono, Beny Rudiawan, Arica Dwi Susanto","doi":"10.46300/91015.2020.14.14","DOIUrl":null,"url":null,"abstract":"PT. XYZ in Surabaya is engaged in the production of commercial ships, providing ship repair and maintenance services as well as general engineering with specifications based on orders. Along with the development of the technology industry, ship production requires every shipyard to evaluate the system used. The time delay is the problem of building a 60 meter commercial ship. The Precedence Diagram Method (PDM) is a method for scheduling project time and showing critical trajectories of project activities. The results showed that in the project scheduling, there are 13 activities that have a zero value or critical activity which are activities Hull Fabrication, Hull Sub Assembly, Hull Assembly, Hull Erection, Blasting and Painting Raw Material, Finishing Hull, Anode, Machinery Outfitting, Cabling, Computing and Information, Machinery Commisioning, Equipment Commisioning, Harbour Acceptance Test, Yard Trial, Delivery to Customer So that it needs more strict control and supervision from the contractor in carrying out the activities of the 60 meter commercial ship building project activities for each activity/activity so that it does not experience delays and the project can be completed on time.","PeriodicalId":158702,"journal":{"name":"International Journal of Systems Applications, Engineering & Development","volume":"38-40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Systems Applications, Engineering & Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46300/91015.2020.14.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

PT. XYZ in Surabaya is engaged in the production of commercial ships, providing ship repair and maintenance services as well as general engineering with specifications based on orders. Along with the development of the technology industry, ship production requires every shipyard to evaluate the system used. The time delay is the problem of building a 60 meter commercial ship. The Precedence Diagram Method (PDM) is a method for scheduling project time and showing critical trajectories of project activities. The results showed that in the project scheduling, there are 13 activities that have a zero value or critical activity which are activities Hull Fabrication, Hull Sub Assembly, Hull Assembly, Hull Erection, Blasting and Painting Raw Material, Finishing Hull, Anode, Machinery Outfitting, Cabling, Computing and Information, Machinery Commisioning, Equipment Commisioning, Harbour Acceptance Test, Yard Trial, Delivery to Customer So that it needs more strict control and supervision from the contractor in carrying out the activities of the 60 meter commercial ship building project activities for each activity/activity so that it does not experience delays and the project can be completed on time.
用优先图法(PDM)确定60米船舶建造工程关键模式
泗水的PT. XYZ从事商业船舶的生产,提供船舶维修和维护服务,以及根据订单提供规格的一般工程。随着科技产业的发展,船舶生产要求各船厂对所使用的系统进行评估。时间延迟是建造60米商船的问题。优先图法(PDM)是一种规划项目时间和显示项目活动关键轨迹的方法。结果表明,在项目调度中,有13项活动为零值或关键活动,分别是船体制造、船体分装配、船体装配、船体安装、喷砂和涂漆原材料、船体整理、阳极、机械舾装、布线、计算和信息、机械调试、设备调试、港口验收试验、堆场试验、交付给客户,使其在开展60米商业造船项目活动活动时,对每项活动/活动都需要承包商更严格的控制和监督,使其不出现延误,按时完成项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信