Construction quality management method of green building engineering structure based on BIM model

Pengcheng Ying
{"title":"Construction quality management method of green building engineering structure based on BIM model","authors":"Pengcheng Ying","doi":"10.1109/ICVRIS51417.2020.00013","DOIUrl":null,"url":null,"abstract":"The traditional construction structure construction quality management method ignores the mutual influence of various factors, divides the construction period into relatively independent links, and conducts quality management separately, resulting in poor management effectiveness of the traditional management method. In order to solve the above problems and improve the feasibility of the quality management method, the green construction engineering structure quality management method based on the BIM model is studied. Analyze the factors that affect the construction quality in the green building construction project, and determine the correlation between the factors. Use the BIM model to improve the three-dimensional spatial information of the building, and combine the PDCA quality management system to achieve the management of the construction quality of the project. The experimental results show that, compared with the traditional construction quality management method, the quality management method based on BIM model is more feasible and effective.","PeriodicalId":162549,"journal":{"name":"2020 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)","volume":"27 5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICVRIS51417.2020.00013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The traditional construction structure construction quality management method ignores the mutual influence of various factors, divides the construction period into relatively independent links, and conducts quality management separately, resulting in poor management effectiveness of the traditional management method. In order to solve the above problems and improve the feasibility of the quality management method, the green construction engineering structure quality management method based on the BIM model is studied. Analyze the factors that affect the construction quality in the green building construction project, and determine the correlation between the factors. Use the BIM model to improve the three-dimensional spatial information of the building, and combine the PDCA quality management system to achieve the management of the construction quality of the project. The experimental results show that, compared with the traditional construction quality management method, the quality management method based on BIM model is more feasible and effective.
基于BIM模型的绿色建筑工程结构施工质量管理方法
传统的建筑结构施工质量管理方法忽视了各种因素的相互影响,将施工周期划分为相对独立的环节,单独进行质量管理,导致传统管理方法的管理有效性较差。为了解决上述问题,提高质量管理方法的可行性,研究了基于BIM模型的绿色建筑工程结构质量管理方法。分析了绿色建筑施工项目中影响施工质量的因素,确定了各因素之间的相关性。利用BIM模型提高建筑的三维空间信息,结合PDCA质量管理体系,实现对项目施工质量的管理。实验结果表明,与传统的施工质量管理方法相比,基于BIM模型的质量管理方法更加可行和有效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信