Live line working at distribution voltage in Hungary, in Central Europe

A. Bobula, A. Szakonyi, G. Weiling
{"title":"Live line working at distribution voltage in Hungary, in Central Europe","authors":"A. Bobula, A. Szakonyi, G. Weiling","doi":"10.1109/TDCLLM.1993.316238","DOIUrl":null,"url":null,"abstract":"After a ten-year-period of introduction, live line working (LLW) by \"hot-stick\" method is generally used in the Hungarian 20 kV distribution networks. However, utilization is below the expected level. In the fast changing political and economic life of Central Europe, wider utilization of LLW is expected, and the electrical utilities are preparing to meet customers' demands. New methods should be introduced, certain organizations are being re-structured, and new types of equipment are needed.<<ETX>>","PeriodicalId":198668,"journal":{"name":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1993.316238","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

After a ten-year-period of introduction, live line working (LLW) by "hot-stick" method is generally used in the Hungarian 20 kV distribution networks. However, utilization is below the expected level. In the fast changing political and economic life of Central Europe, wider utilization of LLW is expected, and the electrical utilities are preparing to meet customers' demands. New methods should be introduced, certain organizations are being re-structured, and new types of equipment are needed.<>
中欧匈牙利配电电压下的带电线路
经过十年的引进,匈牙利20kv配电网普遍采用“热棒”法带电工作(LLW)。然而,利用率低于预期水平。在中欧快速变化的政治和经济生活中,人们期望更广泛地利用LLW,电力公司正在准备满足客户的需求。应该引进新方法,某些组织正在重组,需要新型设备。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信