{"title":"An efficient scheduling algorithm for solving load commitment problem under Time of Use Pricing with bound on Maximum Demand","authors":"I. Ahamed, V. Borkar","doi":"10.1109/PEDES.2014.7041986","DOIUrl":null,"url":null,"abstract":"Under Demand Response (DR) scheme, time dependent tariff such as Time of Use Pricing (TUP) could be employed extensively to motivate the consumer to schedule the loads evenly so that the Maximum Demand (MD) on the system is reduced. However, if TUP is employed, use of the scheduling algorithm will benefit the consumer but not the utility as the MD will not get reduced but shifted. Hence in the future pricing schemes there will be a component dependent on the MD. In this paper, we develop an efficient algorithm which can be used under TUP with a bound on the MD. In our algorithm, the constrained optimization problem is converted to an unconstrained problem using the standard Lagrange multiplier approach.","PeriodicalId":124701,"journal":{"name":"2014 IEEE International Conference on Power Electronics, Drives and Energy Systems (PEDES)","volume":"112 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Power Electronics, Drives and Energy Systems (PEDES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEDES.2014.7041986","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Under Demand Response (DR) scheme, time dependent tariff such as Time of Use Pricing (TUP) could be employed extensively to motivate the consumer to schedule the loads evenly so that the Maximum Demand (MD) on the system is reduced. However, if TUP is employed, use of the scheduling algorithm will benefit the consumer but not the utility as the MD will not get reduced but shifted. Hence in the future pricing schemes there will be a component dependent on the MD. In this paper, we develop an efficient algorithm which can be used under TUP with a bound on the MD. In our algorithm, the constrained optimization problem is converted to an unconstrained problem using the standard Lagrange multiplier approach.
求解最大需求约束下使用时间定价下负荷承诺问题的一种高效调度算法
在需求响应(DR)方案下,可以广泛采用分时电价(TUP)等时间相关电价来激励用户均匀调度负荷,从而降低系统的最大需求(MD)。然而,如果采用TUP,调度算法的使用将使消费者受益,而不是效用,因为MD不会减少而是转移。因此,在未来的定价方案中,将有一个依赖于MD的组件。在本文中,我们开发了一个有效的算法,可以在具有MD界的TUP下使用。在我们的算法中,使用标准拉格朗日乘子方法将约束优化问题转换为无约束问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信