Y. Harumoto, Y. Kabayama, Y. Kuroda, Y. Yoshida, H. Kan, Y. Miura, E. Tamaki, T. Hakata
{"title":"Development of 275 KV EHV Class Gas-Insulated Power Transformer","authors":"Y. Harumoto, Y. Kabayama, Y. Kuroda, Y. Yoshida, H. Kan, Y. Miura, E. Tamaki, T. Hakata","doi":"10.1109/TPAS.1985.318996","DOIUrl":null,"url":null,"abstract":"A 275kV SF6 gas-insulated prototype transformer has been developed and is now under a long term running test for the final technical establishment. Newly developed techniques for composite insulation, liquid cooling, gas pressure regulation, on-load tap-changer, etc. are utilized together with the established ones for the 77kV class gas-vapor cooled transformers, developed in 1981 and working in service since 1982. This paper presents the feasibility examinations, newly developed techniques and performance test results of the prototype transformer.","PeriodicalId":227345,"journal":{"name":"IEEE Transactions on Power Apparatus and Systems","volume":"44 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1985-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"24","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Power Apparatus and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TPAS.1985.318996","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 24
Abstract
A 275kV SF6 gas-insulated prototype transformer has been developed and is now under a long term running test for the final technical establishment. Newly developed techniques for composite insulation, liquid cooling, gas pressure regulation, on-load tap-changer, etc. are utilized together with the established ones for the 77kV class gas-vapor cooled transformers, developed in 1981 and working in service since 1982. This paper presents the feasibility examinations, newly developed techniques and performance test results of the prototype transformer.