{"title":"Optimal Placement and Sizing of Multiple Distributed Generators using Fuzzy Logic","authors":"R. Magadum, D. Kulkarni","doi":"10.1109/ICEES.2019.8719240","DOIUrl":null,"url":null,"abstract":"Due to increase in power demand, over exploitation of existing power system causing huge burden on the network interms of voltage instability, more power losses in the network and power quality issues. In this paper the multiple DG placement and sizing is used to give potential solution for power loss minimizations with good profile within the acceptable voltage limits. The fuzzy logic technique is used for placement of DG and same is tested on s IEEE 33 bus system. The results obtained from fuzzy are satisfactory for stable operation of power system network.","PeriodicalId":421791,"journal":{"name":"2019 Fifth International Conference on Electrical Energy Systems (ICEES)","volume":"144 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 Fifth International Conference on Electrical Energy Systems (ICEES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEES.2019.8719240","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

Due to increase in power demand, over exploitation of existing power system causing huge burden on the network interms of voltage instability, more power losses in the network and power quality issues. In this paper the multiple DG placement and sizing is used to give potential solution for power loss minimizations with good profile within the acceptable voltage limits. The fuzzy logic technique is used for placement of DG and same is tested on s IEEE 33 bus system. The results obtained from fuzzy are satisfactory for stable operation of power system network.
基于模糊逻辑的多个分布式发电机的最优布局和规模
由于电力需求的增加,对现有电力系统的过度开发给电网带来了巨大的负担,出现了电压不稳定、网损增加和电能质量问题。在本文中,多个DG放置和尺寸用于在可接受的电压范围内提供具有良好轮廓的功率损耗最小化的潜在解决方案。采用模糊逻辑技术对DG进行布放,并在IEEE 33总线系统上进行了测试。模糊分析的结果对电网的稳定运行是满意的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信