{"title":"Construction process innovation on Brock Commons Tallwood House","authors":"S. Staub-French, A. Pilon, E. Poirier, Azadeh Fallahi, Mohamed Kasbar, Francisco Calderon, Zahra Teshnizi, Thomas Froese","doi":"10.1108/CI-11-2019-0117","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe purpose of this paper is to present the construction process innovations that enabled the successful delivery of the hybrid mass timber high-rise building in Canada, the Brock Commons Tallwood House at the University of British Columbia. It is one of a set of papers examining the project, including companion papers that describe innovations in the mass timber design process and the impact of these innovations on construction performance. The focus of this paper is on innovation in the construction phase and its relationship to innovations implemented in previous project phases.\n\n\nDesign/methodology/approach\nA mixed-method, longitudinal case study approach was used in this research project to investigate and document the Tallwood House project over a three-year period. Both quantitative and qualitative data collection and analysis techniques were used. Members of the research team observed prefabrication and construction, conducted periodic interviews and reviewed project artefacts.\n\n\nFindings\nThe research identified three innovation “clusters,” including the use of innovative tools, techniques and strategies in the design and construction processes and the role they played in delivering the project. The “clusters” were further characterized according to the type of “connectivity” they afforded, either facilitation, operationalization or materialization. These two perspectives support a compounding view on innovation and help to understand how it can flow throughout a project’s life cycle and across its supply chain. Three process-based innovations were initiated during the design phase, integrated design process, building information modeling and virtual design and construction and flowed through to the construction phase. These were seen to enable the creation of connections that were crucial to the overall success of the project. These innovations were operationalized and enacted through the construction phase as design for manufacturing and assembly and prefabrication, staged construction and just-in-time delivery, integration of safety and risk management and a rigorous quality control and quality assurance process. Finally, a full-scale mock-up was produced for practice and constructability assessment, materializing the radical product innovation that was the mass timber structure. These strategies are used together for a synergistic and integrated approach to increase productivity, expedite the construction schedule and develop an innovative building product.\n\n\nOriginality/value\nThis paper details an in-depth investigation into the diffusion dynamics of multiple systemic innovations for the construction process of a unique building project, the tools and techniques used by the construction manager and team, and the challenges, solutions and lessons learned.\n","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/CI-11-2019-0117","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Purpose The purpose of this paper is to present the construction process innovations that enabled the successful delivery of the hybrid mass timber high-rise building in Canada, the Brock Commons Tallwood House at the University of British Columbia. It is one of a set of papers examining the project, including companion papers that describe innovations in the mass timber design process and the impact of these innovations on construction performance. The focus of this paper is on innovation in the construction phase and its relationship to innovations implemented in previous project phases. Design/methodology/approach A mixed-method, longitudinal case study approach was used in this research project to investigate and document the Tallwood House project over a three-year period. Both quantitative and qualitative data collection and analysis techniques were used. Members of the research team observed prefabrication and construction, conducted periodic interviews and reviewed project artefacts. Findings The research identified three innovation “clusters,” including the use of innovative tools, techniques and strategies in the design and construction processes and the role they played in delivering the project. The “clusters” were further characterized according to the type of “connectivity” they afforded, either facilitation, operationalization or materialization. These two perspectives support a compounding view on innovation and help to understand how it can flow throughout a project’s life cycle and across its supply chain. Three process-based innovations were initiated during the design phase, integrated design process, building information modeling and virtual design and construction and flowed through to the construction phase. These were seen to enable the creation of connections that were crucial to the overall success of the project. These innovations were operationalized and enacted through the construction phase as design for manufacturing and assembly and prefabrication, staged construction and just-in-time delivery, integration of safety and risk management and a rigorous quality control and quality assurance process. Finally, a full-scale mock-up was produced for practice and constructability assessment, materializing the radical product innovation that was the mass timber structure. These strategies are used together for a synergistic and integrated approach to increase productivity, expedite the construction schedule and develop an innovative building product. Originality/value This paper details an in-depth investigation into the diffusion dynamics of multiple systemic innovations for the construction process of a unique building project, the tools and techniques used by the construction manager and team, and the challenges, solutions and lessons learned.
Brock Commons Tallwood House的施工工艺创新
本文的目的是介绍在加拿大成功交付混合木材高层建筑的施工工艺创新,即不列颠哥伦比亚大学的Brock Commons Tallwood House。这是一组研究该项目的论文之一,包括描述大量木材设计过程中的创新以及这些创新对建筑性能的影响的配套论文。本文的重点是在建设阶段的创新及其与前项目阶段实施的创新的关系。设计/方法/方法在这个研究项目中使用了混合方法,纵向案例研究方法,在三年的时间里调查和记录了Tallwood House项目。采用了定量和定性数据收集和分析技术。研究小组的成员观察了预制和施工,进行了定期采访,并审查了项目文物。研究结果确定了三个创新“集群”,包括在设计和施工过程中使用创新工具、技术和策略,以及它们在交付项目中所起的作用。这些“集群”进一步根据它们所提供的“连通性”的类型,即便利、操作化或实体化,加以区分。这两种观点支持对创新的复合观点,并有助于理解创新如何在整个项目生命周期和供应链中流动。在设计阶段启动了三个基于流程的创新,即集成设计流程、建筑信息建模和虚拟设计与施工,并贯穿到施工阶段。这些被视为能够创建对项目整体成功至关重要的连接。这些创新通过施工阶段的制造、装配和预制设计、分阶段施工和及时交付、安全和风险管理的集成以及严格的质量控制和质量保证过程进行了操作和实施。最后,为实践和可建造性评估制作了一个全尺寸模型,实现了大规模木结构的激进产品创新。这些策略一起用于协同和集成的方法,以提高生产力,加快施工进度和开发创新的建筑产品。原创性/价值本文详细介绍了对独特建筑项目施工过程中多个系统创新的扩散动力学,施工经理和团队使用的工具和技术,以及挑战,解决方案和经验教训的深入调查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信