{"title":"Software Project Estimation Using Improved Use Case Point","authors":"S. Bagheri, Alireza Shameli-Sendi","doi":"10.1109/SERA.2018.8477225","DOIUrl":null,"url":null,"abstract":"Estimating metrics, such as effort, schedule and cost, needed for a software to be created and launched into market have significant economical effects. One of the most extensively utilized method for such estimation is a technique called Use Case Points. It is based on the use case modeling which is a popular and widely used technique for capturing and describing the functional requirements of a software system. In this paper multitude number of techniques have been proposed as the basis for improving estimation of the effort, schedule, and costs of software projects. These terms are conceptually similar but utilize different parameter values and metrics. Moreover, different versions of use case points have been proposed. This method suffers some limitations such as less accuracy, failure to consider software risks, failure to consider software quality aspects, failure to consider different levels of software security, and so on. The aim of this paper is to propose a new approach for cost estimation, based on use case points method, by considering all the existing risks related to software projects. The results indicate that the new estimation approach can produce relatively accurate estimates and also declare various aspects of project risks during project estimation. Our results also provide guidance for organizations that want to develop a software project.","PeriodicalId":161568,"journal":{"name":"2018 IEEE 16th International Conference on Software Engineering Research, Management and Applications (SERA)","volume":"397 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 16th International Conference on Software Engineering Research, Management and Applications (SERA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SERA.2018.8477225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

Estimating metrics, such as effort, schedule and cost, needed for a software to be created and launched into market have significant economical effects. One of the most extensively utilized method for such estimation is a technique called Use Case Points. It is based on the use case modeling which is a popular and widely used technique for capturing and describing the functional requirements of a software system. In this paper multitude number of techniques have been proposed as the basis for improving estimation of the effort, schedule, and costs of software projects. These terms are conceptually similar but utilize different parameter values and metrics. Moreover, different versions of use case points have been proposed. This method suffers some limitations such as less accuracy, failure to consider software risks, failure to consider software quality aspects, failure to consider different levels of software security, and so on. The aim of this paper is to propose a new approach for cost estimation, based on use case points method, by considering all the existing risks related to software projects. The results indicate that the new estimation approach can produce relatively accurate estimates and also declare various aspects of project risks during project estimation. Our results also provide guidance for organizations that want to develop a software project.
使用改进用例点的软件项目评估
创建软件并将其投入市场所需的度量,如工作量、进度和成本的估算具有重要的经济效果。这种评估最广泛使用的方法之一是称为用例点的技术。它以用例建模为基础,用例建模是一种流行且广泛使用的技术,用于捕获和描述软件系统的功能需求。在本文中,提出了大量的技术,作为改进软件项目的工作量、进度和成本评估的基础。这些术语在概念上相似,但使用不同的参数值和度量。此外,还提出了不同版本的用例点。这种方法有一些局限性,比如不太准确,没有考虑软件风险,没有考虑软件质量方面,没有考虑不同级别的软件安全,等等。本文的目的是提出一种新的成本估算方法,基于用例点方法,通过考虑与软件项目相关的所有现有风险。结果表明,新的估算方法可以产生相对准确的估算,并在项目估算过程中声明项目风险的各个方面。我们的结果也为想要开发软件项目的组织提供了指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信