Nuclotron Control System

V. Andreev, V. Gorchenko, A. Kirichenko, A. Kovalenko, I. Kulikov, V. Monchinsky, S. Romanov, B. Sveshnikov, A. Tsarenkov, B. Vasilishin, M. Voevodin, V. Volkov
{"title":"Nuclotron Control System","authors":"V. Andreev, V. Gorchenko, A. Kirichenko, A. Kovalenko, I. Kulikov, V. Monchinsky, S. Romanov, B. Sveshnikov, A. Tsarenkov, B. Vasilishin, M. Voevodin, V. Volkov","doi":"10.1109/PAC.1997.751237","DOIUrl":null,"url":null,"abstract":"The superconducting synchrotron, named the Nuclotron is based on miniature iron-shaped held SC-magnets. It was put into operation in March 1993 at the Laboratory of High Energies of the Joint Institute for Nuclear Research in Dubna. Eleven runs of the new accelerator have been performed by the present time. The Nuclotron Control System (NCS) project, which is still under development, started in 1992 and has provided an efficient support for the machine commissioning through all its phases. This paper presents the current status of the whole system and some details of cryogenics, beam injection, and main power supplies subsystems.","PeriodicalId":122662,"journal":{"name":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1997.751237","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

The superconducting synchrotron, named the Nuclotron is based on miniature iron-shaped held SC-magnets. It was put into operation in March 1993 at the Laboratory of High Energies of the Joint Institute for Nuclear Research in Dubna. Eleven runs of the new accelerator have been performed by the present time. The Nuclotron Control System (NCS) project, which is still under development, started in 1992 and has provided an efficient support for the machine commissioning through all its phases. This paper presents the current status of the whole system and some details of cryogenics, beam injection, and main power supplies subsystems.
核子控制系统
这个名为Nuclotron的超导同步加速器是基于小型铁形sc磁铁。它于1993年3月在杜布纳联合核研究所的高能实验室投入使用。到目前为止,新加速器已经运行了11次。核控制系统(NCS)项目于1992年开始,目前仍在开发中,并在其所有阶段为机器调试提供了有效的支持。本文介绍了整个系统的现状,以及低温、束流注入和主要电源子系统的一些细节。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信