WAMS upgrade in the Slovenian power system current status and plans for the future

Gorazd Berginc, U. Rudež, R. Mihalic
{"title":"WAMS upgrade in the Slovenian power system current status and plans for the future","authors":"Gorazd Berginc, U. Rudež, R. Mihalic","doi":"10.1109/EUROCON.2017.8011218","DOIUrl":null,"url":null,"abstract":"Since the first Phasor Measurement Units in Slovenian electricity transmission system operator's (ELES) grid have been put in operation in 2005, the number of installed units has grown considerably. In addition, in recent years, connections have been established with grid operators from Switzerland, Denmark, Italy, Germany, Montenegro and Austria with the purpose of exchanging available measurement data from these units. Besides recorded real-time phasor measurements being helpful during post-mortem analyses the trend is to extend the current functionality of the entire measurement system from mere visualization and observation towards more sophisticated smart and automatized decision-making tool applying advanced mathematical algorithms. The introduction of these special functions is expected to be applied gradually and conservatively. Nevertheless, the final target is to include smart control of special devices as well such as phase-shifting transformer and Static Var Compensation units as a countermeasure to prevent system-wide oscillations in the Europe's continental interconnection.","PeriodicalId":114100,"journal":{"name":"IEEE EUROCON 2017 -17th International Conference on Smart Technologies","volume":"100 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE EUROCON 2017 -17th International Conference on Smart Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EUROCON.2017.8011218","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Since the first Phasor Measurement Units in Slovenian electricity transmission system operator's (ELES) grid have been put in operation in 2005, the number of installed units has grown considerably. In addition, in recent years, connections have been established with grid operators from Switzerland, Denmark, Italy, Germany, Montenegro and Austria with the purpose of exchanging available measurement data from these units. Besides recorded real-time phasor measurements being helpful during post-mortem analyses the trend is to extend the current functionality of the entire measurement system from mere visualization and observation towards more sophisticated smart and automatized decision-making tool applying advanced mathematical algorithms. The introduction of these special functions is expected to be applied gradually and conservatively. Nevertheless, the final target is to include smart control of special devices as well such as phase-shifting transformer and Static Var Compensation units as a countermeasure to prevent system-wide oscillations in the Europe's continental interconnection.
WAMS升级在斯洛文尼亚电力系统中的现状和未来计划
自从斯洛文尼亚电力传输系统运营商(ELES)电网的第一批相量测量装置于2005年投入运行以来,安装的相量测量装置数量大幅增长。此外,近年来还与瑞士、丹麦、意大利、德国、黑山和奥地利的电网运营商建立了联系,目的是交换这些单位的现有测量数据。除了记录的实时相量测量在事后分析中有帮助外,趋势是将整个测量系统的当前功能从单纯的可视化和观察扩展到应用先进数学算法的更复杂的智能和自动化决策工具。预计这些特殊功能的引入将逐步和保守地应用。然而,最终的目标是包括特殊设备的智能控制,以及相移变压器和静态无功补偿单元,作为防止欧洲大陆互联系统范围内振荡的对策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信