{"title":"A software process management system considering workers' workload","authors":"A. Hazeyama, S. Komiya","doi":"10.1109/CMPSAC.1996.541419","DOIUrl":null,"url":null,"abstract":"Workers in software projects are usually engaged in main development and other work, concurrently. Other work might put pressure on the schedule of the whole project. Therefore an order to manage the whole project appropriately, not only the main development work but also other work should be dealt with as management objects. The paper clarifies a framework to support various types of work and different granularity of processes in an integrated manner and shows the behavior of the system using an example. This framework enables appropriate process management of the whole project by taking into consideration workers' workloads (who is doing what activity at what workload at what time).","PeriodicalId":306601,"journal":{"name":"Proceedings of 20th International Computer Software and Applications Conference: COMPSAC '96","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 20th International Computer Software and Applications Conference: COMPSAC '96","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CMPSAC.1996.541419","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Workers in software projects are usually engaged in main development and other work, concurrently. Other work might put pressure on the schedule of the whole project. Therefore an order to manage the whole project appropriately, not only the main development work but also other work should be dealt with as management objects. The paper clarifies a framework to support various types of work and different granularity of processes in an integrated manner and shows the behavior of the system using an example. This framework enables appropriate process management of the whole project by taking into consideration workers' workloads (who is doing what activity at what workload at what time).
一个考虑员工工作量的软件流程管理系统
软件项目的工作人员通常同时从事主要开发和其他工作。其他工作可能会给整个项目的进度带来压力。因此,为了对整个项目进行适当的管理,不仅要把主要的开发工作作为管理对象,还要把其他工作作为管理对象来处理。本文阐明了一个框架,以集成的方式支持各种类型的工作和不同粒度的过程,并通过一个示例展示了系统的行为。该框架通过考虑工作人员的工作负载(谁在什么时间以什么工作负载执行什么活动)来实现对整个项目的适当流程管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信