{"title":"A software process management system considering workers' workload","authors":"A. Hazeyama, S. Komiya","doi":"10.1109/CMPSAC.1996.541419","DOIUrl":null,"url":null,"abstract":"Workers in software projects are usually engaged in main development and other work, concurrently. Other work might put pressure on the schedule of the whole project. Therefore an order to manage the whole project appropriately, not only the main development work but also other work should be dealt with as management objects. The paper clarifies a framework to support various types of work and different granularity of processes in an integrated manner and shows the behavior of the system using an example. This framework enables appropriate process management of the whole project by taking into consideration workers' workloads (who is doing what activity at what workload at what time).","PeriodicalId":306601,"journal":{"name":"Proceedings of 20th International Computer Software and Applications Conference: COMPSAC '96","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 20th International Computer Software and Applications Conference: COMPSAC '96","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CMPSAC.1996.541419","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Workers in software projects are usually engaged in main development and other work, concurrently. Other work might put pressure on the schedule of the whole project. Therefore an order to manage the whole project appropriately, not only the main development work but also other work should be dealt with as management objects. The paper clarifies a framework to support various types of work and different granularity of processes in an integrated manner and shows the behavior of the system using an example. This framework enables appropriate process management of the whole project by taking into consideration workers' workloads (who is doing what activity at what workload at what time).