Kajian Kinerja Pemuatan Batubara dengan Bucket Wheel Excavator (BWE-205) PT Bukit Asam Tbk, di Kecamatan Tanjung Enim, Kabupaten Muara Enim, Sumatera Selatan
{"title":"Kajian Kinerja Pemuatan Batubara dengan Bucket Wheel Excavator (BWE-205) PT Bukit Asam Tbk, di Kecamatan Tanjung Enim, Kabupaten Muara Enim, Sumatera Selatan","authors":"Tessar Ilham Topani, Zaenal, Noor Fauzi","doi":"10.29313/bcsme.v3i2.7924","DOIUrl":null,"url":null,"abstract":"Abstract. Research activities were carried out at PT Bukit Asam Tbk. Is one of the companies engaged in the coal mining industry. Mining activities in this company use an Open Mining System with the type of Area Mining. The company has a production target of 700,000 tons / month, while 325,000 tons / month specifically for BWE 205 and the production target has not been achieved. The mechanical equipment used is one unit Bucket Wheel Excavator, one unit Belt Wagon, one unit Cable Rail Car, one unit Hooper Car. This unit is located in stockpile A OPB 1 and is used as a loading tool. The production target is not achieved predicted due to the age of the old equipment, so there is a decrease in productivity. In this study will look for solutions so that production is achieved, it is necessary to make efforts to improve work efficiency by minimizing the obstacles that occur. The operation of the tool will affect the amount of production, namely with the right excavation method will increase the amount of production, if continuous will increase the amount of production is very significant. The factors that can affect loading production are: filling factor, time and number of bucket revolutions, drag time and work efficiency. From the observations, the results obtained for one bucket rotation were 11.91 seconds with a total spill of 71-78 times. With a work efficiency of 47%. The actual production produced of 166,785 tons / month, after the improvement of production results reached 377,153 tons / month. Efforts made to increase work efficiency and reduce time constraints are sought using several factors, the solution is obtained by paying attention to the factors of man, machine, method, material, and environment. \nAbstrak. Kegiatan penelitian dilakukan di PT Bukit Asam Tbk. Adalah salah satu perusahaan yang bergerak di bidang industri pertambangan batubara. Kegiatan penambangan di perusahaan ini menggunakan Sistem Tambang Terbuka dengan tipe Area Mining. Perusahaan ini memiliki target produksi sebesar 700.000 ton/bulan, sedangkan 325.000 ton/bulan khusus untuk di BWE 205 dan target produksi tersebut belum tercapai. Alat mekanis yang digunakan adalah satu unit Bucket Wheel Excavator, Satu unit Belt Wagon, satu unit Cable Rail Car, satu unit Hooper Car. Unit ini berada di stockpile A OPB 1 dan digunakan sebagai alat muat. Target produksi tidak tercapai diprediksi karena umur alat yang sudah tua, sehingga ada penurunan produktivitas. Pada penelitian ini akan mencari bagaimana solusi agar produksinya tercapai, maka perlu dilakukan upaya perbaikan efisiensi kerja dengan memperkecil hambatan-hambatan yang terjadi. Pengoperasian dari alat akan mempengaruhi jumlah produksi, dengan metode penggalian yang tepat akan menambah jumlah produksi, walaupun tidak besar, namun jika kontinu akan menambah jumlah produksi yang sangat signifikan. Adapun faktor-faktor yang dapat mempengaruhi produksi pemuatan adalah : faktor pengisian, waktu dan jumlah putaran bucket, waktu hambatan dan efisiensi kerja. Dari hasil pengamatan, diperoleh hasil satu kali rotasi bucket didapat 11,91 detik dengan total tumpahan sebanyak 71-78 kali. Dengan efisiensi kerja sebesar 47%. Produksi aktual dihasilkan memperoleh total produksi sebesar 166.785 ton/bulan, setelah dilakukannya perbaikan hasil produksi mencapai 377.153 ton/bulan. Usaha yang dilakukan untuk menaikkan efisiensi kerja dan mengurangi waktu hambatan dicari menggunakan beberapa faktor, solusinya didapatkan dengan cara memperhatikan faktor man, machine, methode, material, dan environment.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"423 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v3i2.7924","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract. Research activities were carried out at PT Bukit Asam Tbk. Is one of the companies engaged in the coal mining industry. Mining activities in this company use an Open Mining System with the type of Area Mining. The company has a production target of 700,000 tons / month, while 325,000 tons / month specifically for BWE 205 and the production target has not been achieved. The mechanical equipment used is one unit Bucket Wheel Excavator, one unit Belt Wagon, one unit Cable Rail Car, one unit Hooper Car. This unit is located in stockpile A OPB 1 and is used as a loading tool. The production target is not achieved predicted due to the age of the old equipment, so there is a decrease in productivity. In this study will look for solutions so that production is achieved, it is necessary to make efforts to improve work efficiency by minimizing the obstacles that occur. The operation of the tool will affect the amount of production, namely with the right excavation method will increase the amount of production, if continuous will increase the amount of production is very significant. The factors that can affect loading production are: filling factor, time and number of bucket revolutions, drag time and work efficiency. From the observations, the results obtained for one bucket rotation were 11.91 seconds with a total spill of 71-78 times. With a work efficiency of 47%. The actual production produced of 166,785 tons / month, after the improvement of production results reached 377,153 tons / month. Efforts made to increase work efficiency and reduce time constraints are sought using several factors, the solution is obtained by paying attention to the factors of man, machine, method, material, and environment.
Abstrak. Kegiatan penelitian dilakukan di PT Bukit Asam Tbk. Adalah salah satu perusahaan yang bergerak di bidang industri pertambangan batubara. Kegiatan penambangan di perusahaan ini menggunakan Sistem Tambang Terbuka dengan tipe Area Mining. Perusahaan ini memiliki target produksi sebesar 700.000 ton/bulan, sedangkan 325.000 ton/bulan khusus untuk di BWE 205 dan target produksi tersebut belum tercapai. Alat mekanis yang digunakan adalah satu unit Bucket Wheel Excavator, Satu unit Belt Wagon, satu unit Cable Rail Car, satu unit Hooper Car. Unit ini berada di stockpile A OPB 1 dan digunakan sebagai alat muat. Target produksi tidak tercapai diprediksi karena umur alat yang sudah tua, sehingga ada penurunan produktivitas. Pada penelitian ini akan mencari bagaimana solusi agar produksinya tercapai, maka perlu dilakukan upaya perbaikan efisiensi kerja dengan memperkecil hambatan-hambatan yang terjadi. Pengoperasian dari alat akan mempengaruhi jumlah produksi, dengan metode penggalian yang tepat akan menambah jumlah produksi, walaupun tidak besar, namun jika kontinu akan menambah jumlah produksi yang sangat signifikan. Adapun faktor-faktor yang dapat mempengaruhi produksi pemuatan adalah : faktor pengisian, waktu dan jumlah putaran bucket, waktu hambatan dan efisiensi kerja. Dari hasil pengamatan, diperoleh hasil satu kali rotasi bucket didapat 11,91 detik dengan total tumpahan sebanyak 71-78 kali. Dengan efisiensi kerja sebesar 47%. Produksi aktual dihasilkan memperoleh total produksi sebesar 166.785 ton/bulan, setelah dilakukannya perbaikan hasil produksi mencapai 377.153 ton/bulan. Usaha yang dilakukan untuk menaikkan efisiensi kerja dan mengurangi waktu hambatan dicari menggunakan beberapa faktor, solusinya didapatkan dengan cara memperhatikan faktor man, machine, methode, material, dan environment.
摘要。研究活动在武吉阿萨姆Tbk进行。是从事煤炭开采行业的公司之一。该公司的采矿活动采用区域采矿类型的开放式采矿系统。公司的生产目标是70万吨/月,而BWE 205的生产目标是32.5万吨/月,尚未达到生产目标。所使用的机械设备为斗轮挖掘机1台、皮带车1台、钢轨车1台、斗车1台。该装置位于库存A OPB 1中,用作装载工具。由于旧设备的老化,生产目标没有达到预期,因此生产率下降。在本研究中将寻找解决方案,使生产实现,有必要努力提高工作效率,尽量减少发生的障碍。工具的操作会影响生产量,即用正确的挖掘方法会增加生产量,如果连续使用会增加生产量是非常显著的。影响装货生产的因素有:灌装因素、斗转次数和时间、拖拽时间和工作效率。从观察结果来看,一个桶旋转的结果为11.91秒,总溢出71-78次。工作效率为47%。实际产量为166785吨/月,改进后的生产成果达到377153吨/月。综合考虑人、机、法、料、环境等因素,力求提高工作效率,减少时间限制。Abstrak。Kegiatan penelitian dilakukan PT Bukit Asam Tbk。Adalah salah satu perusahaan yang bergerak di bidang industri pertambangan batubara。Kegiatan penambangan di perusahaan ini menggunakan systems Tambang Terbuka dengan type Area Mining。Perusahaan ini memiliki目标产品为sebesar 70万吨/bulan, sedangkan 32.5万吨/bulan khususuntuk BWE 205目标产品为terseberum tercapa。Alat mekanis yang digunakan adalah铲斗式轮式挖掘机,铲斗式皮带车,铲斗式钢轨车,铲斗式吊车。单位ini berada di储存A OPB - 1,但digunakan sebagai警报。目标产品为生产能力、生产能力、生产能力、生产能力、生产能力等。Pada penelitian ini akan mencari bagaimana solusi agar produksinya tercapai, maka perlu dilakukan upaya perbaikan efisiensi kerja dengan memperkecil hambatan-hambatan yang terjadi。pengperasian dari alat akan mempengaruhi jumlah producksi, dengan memede penggalian yang tepat akan menambah jumlah producksi, walaupun tidak besar, namun jika kontinu akan menambah jumlah producksi yang sangat signfikan。Adapun factor - factor for yang dapat mempengaruhi producksi pemuatan adalah: factor pengisian, waktu dan jumlah putaran bucket, waktu hambatan dan efisiensi kerja。Dari hasil pengamatan, diperoleh hasil satu kali rotasi bucket didapat 11,91 detik dengan total tumpahan sebanyak 71-78 kali。邓安·埃菲西·克贾·西贝萨尔47%。产量实际达哈什尔坎成员合计产量达166.785吨/bulan,产量达哈什尔坎成员合计产量达377.153吨/bulan。Usaha yang dilakukan untuk menaikkan efisiensi kerja dan mengurangi waktu hambatan dicari menggunakan beberapa factor, solusinya didapatkan dengan cara,是指人、机器、方法、材料、环境等因素。