Rationalizing the Mathematical Model of Boiler Turbine Process with Dead Time

S. Sunori, P. Juneja, M. Chaturvedi, Deeksha Naithani
{"title":"Rationalizing the Mathematical Model of Boiler Turbine Process with Dead Time","authors":"S. Sunori, P. Juneja, M. Chaturvedi, Deeksha Naithani","doi":"10.1109/CICN.2016.105","DOIUrl":null,"url":null,"abstract":"More or less every chemical industrial process suffers from some amount of inherent time delay which is highly undesirable. The presence of this dead time term makes the transfer function model irrational. In the present work, a 2x2 transfer function model of an industrial boiler turbine process with dead time is considered, which after decoupling has been rationalized using Padé approximation. The first, second and third order approximants are determined and validated by comparing open loop step responses.","PeriodicalId":189849,"journal":{"name":"2016 8th International Conference on Computational Intelligence and Communication Networks (CICN)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 8th International Conference on Computational Intelligence and Communication Networks (CICN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICN.2016.105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

More or less every chemical industrial process suffers from some amount of inherent time delay which is highly undesirable. The presence of this dead time term makes the transfer function model irrational. In the present work, a 2x2 transfer function model of an industrial boiler turbine process with dead time is considered, which after decoupling has been rationalized using Padé approximation. The first, second and third order approximants are determined and validated by comparing open loop step responses.
含死时间锅炉汽轮机过程数学模型的合理化
或多或少,每一个化学工业过程都有一定程度的固有时间延迟,这是非常不受欢迎的。这个死时间项的存在使传递函数模型变得不合理。本文研究了含死时间的工业锅炉汽轮机过程的2x2传递函数模型,该模型解耦后采用pad近似进行了合理化。通过比较开环阶跃响应,确定并验证了一阶、二阶和三阶近似。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信