{"title":"UCPabc as an integration model for software cost estimation","authors":"R. S. Dewi, Grandys Frieska Prassida, Sholiq, A. P. Subriadi","doi":"10.1109/ICSITECH.2016.7852631","DOIUrl":null,"url":null,"abstract":"This study aims to construct a scientific model in estimating effort and cost of software development projects. Use Case Points (UCP) is very important method to estimate the total effort in software development projects. While the technique of Activity-based Costing (ABC) serves as the calculation of costs in each of the activities, especially the allocation of project resources. ABC technique consists of five stages are estimates based on the allocation of its resources, by having the total of UCP first. The result of this research is a proposed model of integration between UCP and ABC method or also called UCPabc. UCPabc model testing performed on five software development project small-medium scales. The results of test evaluations UCPabc estimation model with the company's actual cost turned out to be quite impressive, which the deviation only 2.16 percent. Meanwhile, the company forecast profit margin of 30.4 percent between total project contract value with cost estimation by using UCPabc.","PeriodicalId":447090,"journal":{"name":"2016 2nd International Conference on Science in Information Technology (ICSITech)","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"15","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 2nd International Conference on Science in Information Technology (ICSITech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSITECH.2016.7852631","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 15

Abstract

This study aims to construct a scientific model in estimating effort and cost of software development projects. Use Case Points (UCP) is very important method to estimate the total effort in software development projects. While the technique of Activity-based Costing (ABC) serves as the calculation of costs in each of the activities, especially the allocation of project resources. ABC technique consists of five stages are estimates based on the allocation of its resources, by having the total of UCP first. The result of this research is a proposed model of integration between UCP and ABC method or also called UCPabc. UCPabc model testing performed on five software development project small-medium scales. The results of test evaluations UCPabc estimation model with the company's actual cost turned out to be quite impressive, which the deviation only 2.16 percent. Meanwhile, the company forecast profit margin of 30.4 percent between total project contract value with cost estimation by using UCPabc.
UCPabc作为软件成本估算的集成模型
本研究旨在建立一个科学的估算软件开发项目的工作量和成本的模型。用例点(UCP)是评估软件开发项目总工作量的一种非常重要的方法。而作业成本法(ABC)则是对每项活动的成本进行计算,特别是对项目资源的分配。ABC技术由五个阶段组成,是基于其资源分配的估计,首先有UCP的总数。本研究的结果是提出了UCP与ABC方法的集成模型,也称为UCPabc。在五个中小规模的软件开发项目中进行了UCPabc模型测试。用公司的实际成本对UCPabc估算模型进行了测试评估,结果令人印象深刻,偏差仅为2.16%。与此同时,利用UCPabc,预计工程合同总额与成本估算之间的利润率为30.4%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信