Optimal supply planning for two-levels assembly system with stochastic lead-times and maintenance actions

Z. Guiras, S. Turki, N. Rezg, A. Dolgui
{"title":"Optimal supply planning for two-levels assembly system with stochastic lead-times and maintenance actions","authors":"Z. Guiras, S. Turki, N. Rezg, A. Dolgui","doi":"10.1109/IEEM.2016.7797936","DOIUrl":null,"url":null,"abstract":"This paper deals with the supply planning for two level assembly systems under stochastic lead time and random failure machine. The objective is to determine the optimal supply planning of the assembly system while considering the maintenance actions and then to study their impact on the optimal release dates for the components at level 2. The optimal supply planning minimizes the total cost which is the sum of inventory holding cost for components at level 1 and 2, assembly cost, maintenance cost, backlogging and inventory holding cost for the finished product. A mathematical model is proposed to compute the total cost and then to determine the optimal supply planning. Numerical results are presented to discuss the impact of maintenance actions on the optimal release dates.","PeriodicalId":114906,"journal":{"name":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"238 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2016.7797936","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

This paper deals with the supply planning for two level assembly systems under stochastic lead time and random failure machine. The objective is to determine the optimal supply planning of the assembly system while considering the maintenance actions and then to study their impact on the optimal release dates for the components at level 2. The optimal supply planning minimizes the total cost which is the sum of inventory holding cost for components at level 1 and 2, assembly cost, maintenance cost, backlogging and inventory holding cost for the finished product. A mathematical model is proposed to compute the total cost and then to determine the optimal supply planning. Numerical results are presented to discuss the impact of maintenance actions on the optimal release dates.
具有随机交货期和维修行动的两级装配系统的最优供应计划
研究了随机提前期和随机故障机条件下两级装配系统的供应规划问题。目标是在考虑维护行动的同时确定装配系统的最佳供应计划,然后研究它们对第2级组件的最佳发布日期的影响。最优供应计划使总成本最小化,总成本是一级和二级部件的库存成本、装配成本、维护成本、积压成本和成品库存成本的总和。提出了一个计算总成本的数学模型,从而确定最优供应计划。通过数值结果讨论了维护行为对最优发布日期的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信