ANALISIS REMBESAN TERHADAP KEAMANAN BENDUNGAN KEDUNG OMBO DI GROBOGAN, JAWA TENGAH

Rais Buldan, S. Suharyanto, Najib Najib, Kresno Wikan Sadono
{"title":"ANALISIS REMBESAN TERHADAP KEAMANAN BENDUNGAN KEDUNG OMBO DI GROBOGAN, JAWA TENGAH","authors":"Rais Buldan, S. Suharyanto, Najib Najib, Kresno Wikan Sadono","doi":"10.32679/jth.v12i2.657","DOIUrl":null,"url":null,"abstract":"A dam, besides having a great benefits to meet human needs, it also can be a big disaster in addition to the dam collapsing. One of the main causes of failure of an embankment dam is the occurrence of excessive seepage which triggers piping events that can disturb the stability and safety of the dam. In general, the body of the Kedung Ombo Dam is in good condition, but there are several problems, such as the drain holes that are overgrown with dense grass which indicates that seepage has occurred. Therefore, it is necessary to evaluate the seepage to determine the safety level of the Kedung Ombo Dam. This study aims to analyze the condition of pore water pressure and seepage that occurs in the body of the Kedung Ombo Dam and to determine the level of safety of the dam body. The analyze was carried out using seepage monitoring instruments installed on the dam, namely the Piezometer and V-Notch at the Kedung Ombo Dam in 2021. Based on the results of the analysis, it was found that the pore water pressure and seepage discharge that occurred in the Kedung Ombo Dam were generally still within the permissible limits. According to the analysis results of the seepage index, the highest QI value is 0.09 at the maximum flood water level of +95 m, where the safety criteria for the seepage index is QI <1. Therefore it indicates that the seepage condition index at the Kedung Ombo Dam are still in a safe condition.Keywords: pore water pressure, seepage, piezometer, V-Notch, seepage index ","PeriodicalId":356205,"journal":{"name":"JURNAL TEKNIK HIDRAULIK","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL TEKNIK HIDRAULIK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32679/jth.v12i2.657","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

A dam, besides having a great benefits to meet human needs, it also can be a big disaster in addition to the dam collapsing. One of the main causes of failure of an embankment dam is the occurrence of excessive seepage which triggers piping events that can disturb the stability and safety of the dam. In general, the body of the Kedung Ombo Dam is in good condition, but there are several problems, such as the drain holes that are overgrown with dense grass which indicates that seepage has occurred. Therefore, it is necessary to evaluate the seepage to determine the safety level of the Kedung Ombo Dam. This study aims to analyze the condition of pore water pressure and seepage that occurs in the body of the Kedung Ombo Dam and to determine the level of safety of the dam body. The analyze was carried out using seepage monitoring instruments installed on the dam, namely the Piezometer and V-Notch at the Kedung Ombo Dam in 2021. Based on the results of the analysis, it was found that the pore water pressure and seepage discharge that occurred in the Kedung Ombo Dam were generally still within the permissible limits. According to the analysis results of the seepage index, the highest QI value is 0.09 at the maximum flood water level of +95 m, where the safety criteria for the seepage index is QI <1. Therefore it indicates that the seepage condition index at the Kedung Ombo Dam are still in a safe condition.Keywords: pore water pressure, seepage, piezometer, V-Notch, seepage index 
一座大坝,除了能满足人类需求的巨大好处之外,也可能是大坝坍塌之外的巨大灾难。堤防溃坝的主要原因之一是发生过渗引起的管流事件,影响坝体的稳定和安全。总体而言,克东翁布大坝的主体状况良好,但也存在一些问题,例如排水孔长满了茂密的草,这表明已经发生了渗漏。因此,有必要进行渗流评价,以确定克东翁布大坝的安全等级。本研究旨在分析克东翁布大坝坝体孔隙水压力及渗流状况,确定坝体安全水平。分析是在2021年使用安装在大坝上的渗流监测仪器,即Kedung Ombo大坝的Piezometer和V-Notch进行的。分析结果表明,克东翁布大坝的孔隙水压力和渗流流量总体上仍在允许范围内。根据渗流指数分析结果,在洪水最高水位+95 m处,QI值最高为0.09,此时渗流指数的安全标准为QI <1。因此,可东翁布大坝的渗流状况指标仍处于安全状态。关键词:孔隙水压力,渗流,压力计,v型缺口,渗流指数
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信