Access Time and Safety Benefit Analysis of Additional Temporary Water Injection Measures on Primary After the Fukushima

Weidong Liu, Zhao Wang, Leilei Liu, Kuan Zhang
{"title":"Access Time and Safety Benefit Analysis of Additional Temporary Water Injection Measures on Primary After the Fukushima","authors":"Weidong Liu, Zhao Wang, Leilei Liu, Kuan Zhang","doi":"10.1115/icone29-91957","DOIUrl":null,"url":null,"abstract":"\n After the Fukushima nuclear accident, National Nuclear Safety Administration carried out plant inspection nuclear safety on the nuclear plant in operation and under construction, and put forward improvement requirements for each nuclear power plant according to the inspection results. One of the improvement actions was to add temporary water injection measures on the primary side. At present, all power plants have plant requested to add mobile pumps and related water supply pipelines and operating procedures. By summarizing the calculation cases of plant, which selected representative accident sequences for deterministic analysis in the past, this paper determines the effect of implementing temporary water injection measures in primary circuit on accident mitigation at different times, and the results can provide time suggestions for the preparation of mobile equipment in plant. At the same time, the safety benefits after implementing temporary water injection measures in primary circuit in plant are analyzed by using probability analysis method. Based on the analysis of deterministic and probability theory, and considering the preparation time of accessing mobile equipments, it is considered that 4 hours is a reasonable access time for mobile equipments under SBO accident conditions. In the actual access process, this time can ensure that operators have a more suitable time to complete the preparation work of mobile equipments in operation, and at the same time contribute to the reduction of large release frequency. At the same time, it should be noted that at present, the contribution of implementing temporary water injection measures on the primary side under SBO accident is mainly analyzed. In fact, some accident situations with slow development except SBO accident also have great access possibility, so the actual safety benefits of temporary water injection measures on the primary circuit may be more.","PeriodicalId":407628,"journal":{"name":"Volume 13: Risk Assessments and Management","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 13: Risk Assessments and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/icone29-91957","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

After the Fukushima nuclear accident, National Nuclear Safety Administration carried out plant inspection nuclear safety on the nuclear plant in operation and under construction, and put forward improvement requirements for each nuclear power plant according to the inspection results. One of the improvement actions was to add temporary water injection measures on the primary side. At present, all power plants have plant requested to add mobile pumps and related water supply pipelines and operating procedures. By summarizing the calculation cases of plant, which selected representative accident sequences for deterministic analysis in the past, this paper determines the effect of implementing temporary water injection measures in primary circuit on accident mitigation at different times, and the results can provide time suggestions for the preparation of mobile equipment in plant. At the same time, the safety benefits after implementing temporary water injection measures in primary circuit in plant are analyzed by using probability analysis method. Based on the analysis of deterministic and probability theory, and considering the preparation time of accessing mobile equipments, it is considered that 4 hours is a reasonable access time for mobile equipments under SBO accident conditions. In the actual access process, this time can ensure that operators have a more suitable time to complete the preparation work of mobile equipments in operation, and at the same time contribute to the reduction of large release frequency. At the same time, it should be noted that at present, the contribution of implementing temporary water injection measures on the primary side under SBO accident is mainly analyzed. In fact, some accident situations with slow development except SBO accident also have great access possibility, so the actual safety benefits of temporary water injection measures on the primary circuit may be more.
福岛核事故后初级反应堆额外临时注水措施的获取时间和安全效益分析
福岛核事故发生后,国家核安全局对正在运行和在建的核电站进行了核安全检查,并根据检查结果对各核电站提出了改进要求。其中一项改进措施是在主侧增加临时注水措施。目前,所有电厂都已要求加装移动水泵及相关的供水管道和操作程序。本文通过总结电厂以往选取有代表性的事故序列进行确定性分析的计算案例,确定在不同时间实施一次回路临时注水措施对事故缓解的效果,为电厂移动设备的准备提供时间建议。同时,运用概率分析法对电厂一次回路实施临时注水措施后的安全效益进行了分析。基于确定性和概率论的分析,考虑到移动设备接入的准备时间,认为在SBO事故条件下,4小时是移动设备的合理接入时间。在实际接入过程中,这个时间可以保证运营商有更合适的时间来完成运行中的移动设备的准备工作,同时有助于减少大的放行频率。同时需要注意的是,目前主要分析的是SBO事故下主侧实施临时注水措施的贡献。事实上,除了SBO事故外,一些发展缓慢的事故情况也有很大的接入可能性,因此一次回路临时注水措施的实际安全效益可能更大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信