Estimating the Costs of Operating Reserve Provision by Poundage Hydroelectric Power Plants

R. Petrichenko, K. Baltputnis, D. Sobolevsky, A. Sauhats
{"title":"Estimating the Costs of Operating Reserve Provision by Poundage Hydroelectric Power Plants","authors":"R. Petrichenko, K. Baltputnis, D. Sobolevsky, A. Sauhats","doi":"10.1109/EEM.2018.8469876","DOIUrl":null,"url":null,"abstract":"The transmission system operators are entrusted with the task of ensuring stable and reliable functioning of the power system. In a modern power system, there are three groups of market actors who can be called upon by TSOs to aid in power system operation management: controllable generation, energy storage and controllable load. The owners of these assets can rightfully expect remuneration for their services from the TSO to recoup investment costs and operational expenses. This study is focused on poundage hydroelectric power plants and it strives to estimate the cost of operating reserve provision. Data of the large hydroelectric power plants located on the River Daugava is used for the calculation of costs and validation of the proposed algorithms.","PeriodicalId":334674,"journal":{"name":"2018 15th International Conference on the European Energy Market (EEM)","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 15th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2018.8469876","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The transmission system operators are entrusted with the task of ensuring stable and reliable functioning of the power system. In a modern power system, there are three groups of market actors who can be called upon by TSOs to aid in power system operation management: controllable generation, energy storage and controllable load. The owners of these assets can rightfully expect remuneration for their services from the TSO to recoup investment costs and operational expenses. This study is focused on poundage hydroelectric power plants and it strives to estimate the cost of operating reserve provision. Data of the large hydroelectric power plants located on the River Daugava is used for the calculation of costs and validation of the proposed algorithms.
庞吉式水力发电厂营运储备准备成本估算
输电系统运营商被赋予了确保电力系统稳定可靠运行的任务。在现代电力系统中,tso可以调用三组市场参与者来辅助电力系统运行管理:可控发电、可控储能和可控负荷。这些资产的所有者可以理所当然地期望从TSO那里获得服务报酬,以收回投资成本和运营费用。本研究以庞吉水力发电厂为研究对象,试图估算营运储备供给的成本。利用位于道加瓦河上的大型水力发电厂的数据进行成本计算和算法的验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信