{"title":"AEP Event of March 20, 2018","authors":"Bret Burford","doi":"10.1109/cpre48231.2021.9429713","DOIUrl":null,"url":null,"abstract":"N-5(+) System Configuration • Large Voltage Angle Separation • 138 kV CG Line Fault • Ten other lines tripped • Seven 138 kV lines tripped • Three 69 kV lines tripped • Outage of entire area $\\sim 130 \\mathrm{MW}$","PeriodicalId":405115,"journal":{"name":"2021 74th Conference for Protective Relay Engineers (CPRE)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 74th Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/cpre48231.2021.9429713","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
N-5(+) System Configuration • Large Voltage Angle Separation • 138 kV CG Line Fault • Ten other lines tripped • Seven 138 kV lines tripped • Three 69 kV lines tripped • Outage of entire area $\sim 130 \mathrm{MW}$