Simulation and optimisation based approach for job shop scheduling problems

P. Kulkarni, J. Venkateswaran
{"title":"Simulation and optimisation based approach for job shop scheduling problems","authors":"P. Kulkarni, J. Venkateswaran","doi":"10.1109/IEEM.2016.7797897","DOIUrl":null,"url":null,"abstract":"This paper presents a hybrid Simulation based Optimization (SbO) approach to solve job shop scheduling problems. SbO structure for classical job shop scheduling introduced by [6] is extended for flexible job shop scheduling problem (FJSSP). Performance of SbO is bench-marked in terms of number of decision variables, constraints, objective value and computational time against various Mixed Integer Programming (MIP) based methods from literature. SbO outperforms for all the parameters and performs better with increasing problem size. Further, an hybrid solution architecture, Combined Simulation & Optimization (CSO) is introduced which integrates SbO and MIP to expedite the convergence to exact optimal solution. Results for CSO are also bench-marked against MIP based approaches, which shows that CSO performs better and converges faster.","PeriodicalId":114906,"journal":{"name":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2016.7797897","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper presents a hybrid Simulation based Optimization (SbO) approach to solve job shop scheduling problems. SbO structure for classical job shop scheduling introduced by [6] is extended for flexible job shop scheduling problem (FJSSP). Performance of SbO is bench-marked in terms of number of decision variables, constraints, objective value and computational time against various Mixed Integer Programming (MIP) based methods from literature. SbO outperforms for all the parameters and performs better with increasing problem size. Further, an hybrid solution architecture, Combined Simulation & Optimization (CSO) is introduced which integrates SbO and MIP to expedite the convergence to exact optimal solution. Results for CSO are also bench-marked against MIP based approaches, which shows that CSO performs better and converges faster.
基于仿真与优化的作业车间调度方法
提出了一种基于混合仿真的优化方法来解决作业车间调度问题。将[6]提出的经典作业车间调度的SbO结构扩展到柔性作业车间调度问题(FJSSP)。从决策变量的数量、约束条件、目标值和计算时间等方面对基于文献的各种混合整数规划(MIP)方法的SbO性能进行了基准测试。SbO在所有参数上都表现出色,并且随着问题规模的增加而表现更好。在此基础上,提出了一种结合SbO和MIP的混合解决方案CSO (Combined Simulation & Optimization),以加速收敛到精确的最优解。CSO算法的结果与基于MIP的方法进行了基准测试,结果表明CSO算法性能更好,收敛速度更快。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信