{"title":"Research on the Construction of Capacity Courses Group Based on BSC","authors":"Hui-Long Yang","doi":"10.1109/ICMA.2010.43","DOIUrl":null,"url":null,"abstract":"The construction of courses group which appears recently in the courses construction practice of institutions of higher education is a new curriculum development technique. Starting from construction of course groups of our college and actual of the reform, this paper summarizes our college capacity courses group construction’ problems, as viewed from strengthening course groups construction and stressing on training of applied talents, constructs the application ideas of using the Balanced Scorecard (BSC) to implement performance management for course groups construction, and expounds the construction of capacity course group specific countermeasures and suggestions.","PeriodicalId":233469,"journal":{"name":"2010 International Conference on Manufacturing Automation","volume":"356 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Manufacturing Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMA.2010.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The construction of courses group which appears recently in the courses construction practice of institutions of higher education is a new curriculum development technique. Starting from construction of course groups of our college and actual of the reform, this paper summarizes our college capacity courses group construction’ problems, as viewed from strengthening course groups construction and stressing on training of applied talents, constructs the application ideas of using the Balanced Scorecard (BSC) to implement performance management for course groups construction, and expounds the construction of capacity course group specific countermeasures and suggestions.