{"title":"Storage yard management for transshipment ports","authors":"Xinjia Jiang, L. Lee, E. P. Chew, K. Tan","doi":"10.1109/CoASE.2013.6653898","DOIUrl":null,"url":null,"abstract":"In transshipment ports, the loading and unloading activities are both concentrated and inevitably happen at the same time. Thus the storage yard management is more challenging than that in a general import-export container terminal. Our studies on storage yard management can be divided into three phases, namely yard sectioning, yard template planning and space allocation. This paper focuses on the short-term space allocation from an integrated perspective, where all yard resources are considered. A flexible space-sharing strategy is used in this study to improve the space utilization while storing the containers according to their destination vessel for a faster loading process. A MIP model is formulated for space allocation considering the storage space, yard cranes and prime movers. Numerical experiments show that the MIP model can effectively control violations in short-term space allocation. And the flexible space-sharing strategy can increase the storage capacity and make the storage yard more adaptable to fluctuations caused by vessel delay.","PeriodicalId":191166,"journal":{"name":"2013 IEEE International Conference on Automation Science and Engineering (CASE)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Automation Science and Engineering (CASE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CoASE.2013.6653898","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
In transshipment ports, the loading and unloading activities are both concentrated and inevitably happen at the same time. Thus the storage yard management is more challenging than that in a general import-export container terminal. Our studies on storage yard management can be divided into three phases, namely yard sectioning, yard template planning and space allocation. This paper focuses on the short-term space allocation from an integrated perspective, where all yard resources are considered. A flexible space-sharing strategy is used in this study to improve the space utilization while storing the containers according to their destination vessel for a faster loading process. A MIP model is formulated for space allocation considering the storage space, yard cranes and prime movers. Numerical experiments show that the MIP model can effectively control violations in short-term space allocation. And the flexible space-sharing strategy can increase the storage capacity and make the storage yard more adaptable to fluctuations caused by vessel delay.