Combining simulation and optimization models on a production line problem: A case study

António A. C. Vieira, E. Guilherme, J.A. Oliveira, L. Dias, G. Pereira
{"title":"Combining simulation and optimization models on a production line problem: A case study","authors":"António A. C. Vieira, E. Guilherme, J.A. Oliveira, L. Dias, G. Pereira","doi":"10.46354/i3m.2019.emss.026","DOIUrl":null,"url":null,"abstract":"To improve the performance of a production line of a company of the Bosch Group, an optimization model was developed, which produces the optimum allocation of tasks to workstations and workers, according to a set of constraints. These results can thereafter be used in the simulation model, to estimate performance indicators, which would be difficult to estimate with other approaches, namely: waiting times, times spent with displacements and utilization rates. Thus, the purpose of this paper is twofold. First, it describes the combined use of the optimization and the simulation models. Thereafter, it presents the results obtained for 2 scenarios: one without displacements and another with displacements. The former was used to compare the simulation and the optimization models, whilst the later was used to assess the impact of displacements in the production line. By analyzing the results, it was possible to verify that the displacements increased the total time required to produce the devices in more than 10%. Furthermore, it was shown that the displacements caused considerable changes in the remaining performance indicators, indicating the relevance of considering them. This work also brings insights to the Industry 4.0 by proposing an approach to virtualize a production line system, providing the benefits of the 3D visualization of the simulation tool used in this research.","PeriodicalId":253381,"journal":{"name":"THE EUROPEAN MODELING AND SIMULATION SYMPOSIUM","volume":"275 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"THE EUROPEAN MODELING AND SIMULATION SYMPOSIUM","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46354/i3m.2019.emss.026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

To improve the performance of a production line of a company of the Bosch Group, an optimization model was developed, which produces the optimum allocation of tasks to workstations and workers, according to a set of constraints. These results can thereafter be used in the simulation model, to estimate performance indicators, which would be difficult to estimate with other approaches, namely: waiting times, times spent with displacements and utilization rates. Thus, the purpose of this paper is twofold. First, it describes the combined use of the optimization and the simulation models. Thereafter, it presents the results obtained for 2 scenarios: one without displacements and another with displacements. The former was used to compare the simulation and the optimization models, whilst the later was used to assess the impact of displacements in the production line. By analyzing the results, it was possible to verify that the displacements increased the total time required to produce the devices in more than 10%. Furthermore, it was shown that the displacements caused considerable changes in the remaining performance indicators, indicating the relevance of considering them. This work also brings insights to the Industry 4.0 by proposing an approach to virtualize a production line system, providing the benefits of the 3D visualization of the simulation tool used in this research.
结合生产线问题的仿真和优化模型:一个案例研究
为了提高博世集团某公司生产线的性能,建立了一个优化模型,根据一组约束条件,对工作站和工人进行最优的任务分配。这些结果可用于模拟模型,以估计性能指标,这将难以估计与其他方法,即:等待时间,时间花费与置换和利用率。因此,本文的目的是双重的。首先,介绍了优化模型与仿真模型的结合使用。然后给出了无位移和有位移两种情况下的结果。前者用于比较仿真模型和优化模型,后者用于评估位移对生产线的影响。通过分析结果,可以验证位移使生产设备所需的总时间增加了10%以上。此外,报告还指出,流离失所使其余业绩指标发生了相当大的变化,表明考虑这些指标的相关性。这项工作还通过提出一种虚拟化生产线系统的方法,为工业4.0带来了见解,提供了本研究中使用的仿真工具的3D可视化的好处。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信