G. Rancilio, M. S. Pasquadibisceglie, M. Merlo, F. Bovera, D. Falabretti, M. Delfanti
{"title":"Limited Energy Reservoirs: analysis of the proposed methodology for opening Frequency Containment Reserve to energy storage in EU","authors":"G. Rancilio, M. S. Pasquadibisceglie, M. Merlo, F. Bovera, D. Falabretti, M. Delfanti","doi":"10.1109/EEEIC.2019.8783858","DOIUrl":null,"url":null,"abstract":"EU Network Codes are encouraging power system operators to integrate nonconventional generation units in the evolving Ancillary Services Markets. Article 156 of System Operation Guidelines requests TSOs to perform a cost-benefit analysis for defining a minimum delivery time period for Frequency Containment Reserve (FCR) provided by units with Limited Energy Reservoirs (LER). A research group in Politecnico di Milano followed the process closely cooperating with ARERA, the Italian Regulatory Authority. This paper aims at describing in depth the methodology proposed by TSOs for analyzing system costs related to the introduction of a certain share of LER among FCR providers. Some qualitative and quantitative investigations are then proposed. Critical aspects of the methodology proposed by TSOs are described. The impact on energy storage of the differences among countries’ way of providing FCR is highlighted.","PeriodicalId":422977,"journal":{"name":"2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEEIC.2019.8783858","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
EU Network Codes are encouraging power system operators to integrate nonconventional generation units in the evolving Ancillary Services Markets. Article 156 of System Operation Guidelines requests TSOs to perform a cost-benefit analysis for defining a minimum delivery time period for Frequency Containment Reserve (FCR) provided by units with Limited Energy Reservoirs (LER). A research group in Politecnico di Milano followed the process closely cooperating with ARERA, the Italian Regulatory Authority. This paper aims at describing in depth the methodology proposed by TSOs for analyzing system costs related to the introduction of a certain share of LER among FCR providers. Some qualitative and quantitative investigations are then proposed. Critical aspects of the methodology proposed by TSOs are described. The impact on energy storage of the differences among countries’ way of providing FCR is highlighted.
欧盟网络规范鼓励电力系统运营商在不断发展的辅助服务市场中整合非常规发电机组。《系统运行指南》第156条要求tso进行成本效益分析,以确定由有限能量储存器(LER)提供的频率控制储备(FCR)的最小交付周期。米兰理工大学(Politecnico di Milano)的一个研究小组与意大利监管机构ARERA密切合作,跟踪了这一过程。本文旨在深入描述tso提出的方法,用于分析与在FCR提供商中引入一定份额的LER相关的系统成本。然后提出了一些定性和定量的研究。描述了tso提出的方法的关键方面。强调了各国提供FCR方式的差异对储能的影响。