{"title":"Newsletter 3","authors":"Todd Ringler, Harvey Cohen, Ken Brink, Richard Cardwell","doi":"10.1086/alctemp.3.1","DOIUrl":null,"url":null,"abstract":"The testing period for GGP will end on 30 June of this year and the project itself will start on 1st July. Therefore, all GGP groups should be in their final phases for installing new equipment, testing data acquisition systems etc. As far as we can tell, there should be more than ten groups that are already recording satisfactorily and will be able to start on time. Other groups should of course make extra effort to complete their preparations as soon as possible so as to be able to contribute data for the Observing Period.","PeriodicalId":185792,"journal":{"name":"Alcohol and Temperance History Group Newsletter","volume":"228 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1981-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Alcohol and Temperance History Group Newsletter","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1086/alctemp.3.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
The testing period for GGP will end on 30 June of this year and the project itself will start on 1st July. Therefore, all GGP groups should be in their final phases for installing new equipment, testing data acquisition systems etc. As far as we can tell, there should be more than ten groups that are already recording satisfactorily and will be able to start on time. Other groups should of course make extra effort to complete their preparations as soon as possible so as to be able to contribute data for the Observing Period.